GOVERNMENT OF ODISHA

DEPARTMENT OF WATER RESOURCES

PMIS for ISS/MMIPs/UGPL Projects

Total No of Schemes – 53 nos ( ISS-46, MMIPs-6, UGPL-1 )
1/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Shuttering of D/S Divide wall, 7th lift is under progress.
2/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
De-shuttering of Divide wall, 6th lift and Binding of reinforcement for Abutment with Counterfort wall, 7th lift is under progress.
3/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Slump testing M25A20 (Value 80 mm) of D/S Divide wall, 4th lift done in presence of Client & PSS Team.
4/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Concreting M25A20 of D/S Divide wall, 4th lift is under progress in presence of Client & PSS Team.
5/100
Instream Storage Structure, Jharbeda
U/S CC Blocks area inverted Filter work is under progress.
6/100
Instream Storage Structure, Jharbeda
Shuttering of Pier No-5, 9th lift is under progress.
7/100
Instream Storage Structure, Jharbeda
Shuttering of Pier No-7, 7th lift is under progress.
8/100
Instream Storage Structure, Jharbeda
Binding of reinforcement for RHS D/S (D2) portion Footing Bottom is under progress.
9/100
Instream Storage Structure, Jharbeda
Curing of D/S Curtain wall is under progress.
10/100
Instream Storage Structure, Hamirpur
Slump testing M35A20 (Value 85 mm) of Cross Girder(Bay No-20) done in presence of Client & PSS Team.
11/100
Instream Storage Structure, Hamirpur
Concreting M35A20 of Cross Girder(Bay No-20) is under progress in presence of Client & PSS Team.
12/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 90 mm) of D/S (Bank side) Flared out Cut-off wall, 2nd lift & 5th lift done in presence of Client & PSS Team.
13/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of D/S (Bank side) Flared out Cut-off wall, 2nd lift & 5th lift is under progress in presence of Client & PSS Team.
14/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 30.56/mm2 for 28 days) of Pier no-14, 13th lift and (Strength is 31.09/mm2 for 28 days) of Pier No-1, 4th lift and M15A40 (Strength is 20.89/mm2 for 28 days) of D/S Cross Toe wall, 3rd lift at Block No-5 has done in presence of Client & PSS team.
15/100
Instream Storage Structure, Hamirpur
Barrage service gate single pier hoist bridge assembly No-17 stiffener welding work is in under progress.
16/100
Instream Storage Structure, Hamirpur
Pier No-9 vertical Groove 2nd stage embedded parts sliding track erection work is in progress.
17/100
Instream Storage Structure, Hamirpur
Shuttering of Gantry Girders is under progress.
18/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for U/S Abutment (A1) is under progress.
19/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for RHS U/S Flank wall, Raft at Block No-1 is under progress.
20/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-3, 4th lift is under progress.
21/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-4, 4th lift is under progress.
22/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-6, 13th lift is under progress.
23/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-21, 9th lift is under progress.
24/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Girder is under progress.
25/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for D/S Flank raft at Block no-5 is under progress.
26/100
Instream Storage Structure, Khalpal
Slump testing M20A20 (Value 80 mm) of Gravity floor done in presence of Client & PSS Team.
27/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Gravity floor is under progress in presence of Client & PSS Team.
28/100
Instream Storage Structure Across Mahanadi at Choudhrygada and across Paika at Tikhiri
Pier steel placing and binding work in progress at Choudhary gada iss project.
29/100
Integrated Barrage across river Kochila and across river Baitarini
Barrage bay raft reinforcement fixing work in progress at baitarani iss project.
30/100
Instream Storage Structure, KansariGanda
Curing continuing at site.
31/100
Instream Storage Structure, KansariGanda
Slump cone test conducted at site.
32/100
Instream Storage Structure, KansariGanda
Visit of AEE, AE of Dept., RI, Amin and QA/QC Exp., SD Expert along with Site Engineers PMC to the ISS Site. Inspected the overall progress of site and Pile depth checked, Pier-6 1st lift reinforcement & shuttering checked.
33/100
Instream Storage Structure, KansariGanda
Visit of AEE, AE of Dept., RI, Amin and QA/QC Exp., SD Expert along with Site Engineers PMC to the ISS Site. Inspected the overall progress of site and Pile depth checked, Pier-6 1st lift reinforcement & shuttering checked.
34/100
Instream Storage Structure, KansariGanda
Visit of AEE, AE of Dept., RI, Amin and QA/QC Exp., SD Expert along with Site Engineers PMC to the ISS Site. Inspected the overall progress of site and Pile depth checked, Pier-6 1st lift reinforcement & shuttering checked.
35/100
Instream Storage Structure, KansariGanda
Visit of AEE, AE of Dept., RI, Amin and QA/QC Exp., SD Expert along with Site Engineers PMC to the ISS Site. Inspected the overall progress of site and Pile depth checked, Pier-6 1st lift reinforcement & shuttering checked.
36/100
Instream Storage Structure Across Mahanadi at Choudhrygada and across Paika at Tikhiri
CC block casting work in progress.
37/100
Integrated Barrage across river Kochila and across river Baitarini
Barrage bay raft reinforcement fixing work in progress at baitarani iss project.
38/100
Instream Storage Structure Across Mahanadi at Choudhrygada and across Paika at Tikhiri
LHS under sluice plate load test work in progress at choudharygada iss-24.03.2026
39/100
Integrated Barrage across river Kochila and across river Baitarini
Barrage bay raft reinforcement fixing work in progress at baitarani iss project.
40/100
Instream Storage Structure Across Mahanadi at Choudhrygada and across Paika at Tikhiri
• Visit of CE, MBBS along with SE, Kendrapada , GM and SM,OCCl and PMC, Chandikhol to Choudhury gada and Tikhiri ISS project site. Discuss with Agency regarding planning and progress of work-23.03.2026
41/100
Instream Storage Structure Across Mahanadi at Choudhrygada and across Paika at Tikhiri
• Visit of CE, MBBS along with SE, Kendrapada , GM and SM,OCCl and PMC, Chandikhol to Choudhury gada and Tikhiri ISS project site. Discuss with Agency regarding planning and progress of work-23.03.2026
42/100
UGPL, Right Lower Suktel Canal Division
Bermad equipment installation work is in progress of OCS-0213071-C08A at village Bhaler in presence of PMC team.
43/100
UGPL, Right Lower Suktel Canal Division
OCS chamber piping work is in progress of OCS No-0213090-C06A at village Chandrapur in presence of PMC team.
44/100
UGPL, Right Lower Suktel Canal Division
Inspected of Butterfly valve and Butterfly valve Chamber is in progress for 500mm DIa DI pipe from J-5013 to J-5031 (p-5032) at village Motijharia.
45/100
UGPL, Left Lower Suktel Canal Division
HDPE Tee (75 X140X 75) connection work is in progress at LO-298, LM-16 near village Kushang in presence of PMC team.
46/100
UGPL, Left Lower Suktel Canal Division
HDD machine road pushing work is in progress for road crossing work of 75mm Dia HDPE pipe line between at RO-280A(Z-5874), RM-15 near village Pardhiapali.
47/100
UGPL, Left Lower Suktel Canal Division
Stem pipe Encasing Reinforcement binding work is in progress at LO-115B, LM-6 Near village Badipali In Presence of PMC team .
48/100
UGPL, Left Lower Suktel Canal Division
Excavation work is in progress for laying of 75mm Dia HDPE pipeline at LO-127 of LM-7, near Village Lankabahal in presence of DoWR AE and PMC team.
49/100
UGPL, Left Lower Suktel Canal Division
Excavation work is in progress for laying and gap closing of 400mm Dia DI pipeline node from J-1 to J-644, RM-1 near villagej Gerdi.
50/100
Instream Storage Structure, Hamirpur
Slump testing M35A20 (Value 85 mm) of Gantry Girder No-5 done in presence of Client & PSS Team.
51/100
Instream Storage Structure, Hamirpur
Concreting M35A20 of Gantry Girder No-5 is under progress in presence of Client & PSS Team.
52/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 85 mm) of Pier No-13, 13th lift at Block No-2 done in presence of Client & PSS Team.
53/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of Pier No-13, 13th lift at Block No-2 is under progress in presence of Client & PSS Team.
54/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 90 mm) of D/S Pier No-4, 2nd lift done in presence of Client & PSS Team.
55/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of D/S Pier No-4, 2nd lift is under progress in presence of Client & PSS Team.
56/100
Instream Storage Structure, Hamirpur
Testing of Compressive M15A40 (Strength is 20.39/mm2 for 28 days) of RHS Core wall, 11th lift at Block No-5 and (Strength is 20.44/mm2 for 28 days) of U/S Flared out Cut off wall, 9th lift at Block No-5 and M25A20 (Strength is 30.94/mm2 for 28 days) of Pier No-7, 11th lift has done in presence of Client & PSS team.
57/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for U/S Abutment (A1) is under progress.
58/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for U/S Flank wall, Raft at Block No-1 is under progress.
59/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-3, 4th lift is under progress.
60/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-13, 13th lift is under progress.
61/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-16, 10th lift is under progress.
62/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-21, 9th lift is under progress.
63/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Girder is under progress.
64/100
Instream Storage Structure, Hamirpur
Shuttering of D/S Cut-off wall, 2nd lift at Block No-5 is under progress.
65/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Visited by QC&QA Expert, PMU in presence of Dy. TL, QAE, PSE & IEE of PSS team, A.E.E & A.E, RDD along with representative of EPC agency regarding checking for concreting, Shuttering & binding of reinforcement for D/S Divide wall and other ongoing activities at Site.
66/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Earth excavation of LHS side for Raft is under progress.
67/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Binding of reinforcement for D/S Divide wall, 7th lift is under progress.
68/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Shuttering of Divide wall, 7th lift and Middle pier, Final lift is under progress.
69/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Visited by QC&QA Expert, PMU in presence of Dy. TL, QAE, PSE & IEE of PSS team, A.E.E & A.E, RDD along with representative of EPC agency regarding checking for concreting of D/S Gravity floor at Barrage Bay (Raft side), Shuttering & binding of reinforcement for LHS D/S Counterfort & Wing wall and other ongoing activities at Site.
70/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Binding of reinforcement for RHS Counterfort & Abutment wall, 1st lift is under progress.
71/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Binding of reinforcement for RHS Mid-pier, 1st lift is under progress.
72/100
Instream Storage Structure, Jharbeda
Curing of Gravity floor is under progress.
73/100
Instream Storage Structure, Jharbeda
Binding of reinforcement for RHS D/S (D2) portion Footing Bottom is under progress.
74/100
Instream Storage Structure, Jharbeda
Observed of Sieve analysis of Coarse aggregate (10mm & 20mm) and Fine aggregate in presence of Client & PSS team along with EPC agency.
75/100
Instream Storage Structure, Khalpal
Slump testing M20A20 (Value 85 mm) of Gravity floor done in presence of Client & PSS Team.
76/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Gravity floor is under progress in presence of Client & PSS Team.
77/100
Instream Storage Structure, Budharaja
Excavation work is in Progress at LHS Under sluice bay .
78/100
Instream Storage Structure, Budharaja
Staff Quarter ground floor plastering work is in Progress.
79/100
Instream Storage Structure, Budharaja
Curing Work is in Progress.
80/100
Instream Storage Structure, Budharaja
View showing flow of river from U/S to D/S of river.
81/100
Instream Storage Structure, Budharaja
Shuttering work is in Progress at LHS U/S Flared-out Wall, 23rd Step. RL: 218.900 to 219.500.
82/100
Instream Storage Structure, Budharaja
Curing Work is in Progress.
83/100
Instream Storage Structure, Budharaja
View showing flow of river from U/S to D/S of river.
84/100
Instream Storage Structure, Khirasasan
Walk-Way erection work in progress
85/100
Instream Storage Structure, Khirasasan
16th Column errection in progress (Out of 20)
86/100
Instream Storage Structure, Khirasasan
View showing flow of river from U/S to D/S of river.
87/100
Instream Storage Structure, Khirasasan
Slump 85mm
88/100
Instream Storage Structure, Khirasasan
checked placing supporting bars and alignment of shuttering work in RHS U/S flared out profile 2nd step RL- 211.100 to 211.700 Now the area is ready for concrete casting M20 A20. So recommended for the purpose. Approved by AEE sir SID Sambalpur in presence of JE
89/100
Instream Storage Structure, Khirasasan
RHS U/S FLANK WALL PROFILE 7TH LIFT SHUTTERING WORK is UNDER PROGRESS.
90/100
Instream Storage Structure, Khirasasan
RHS U/S FLARED OUT WALL PROFILE 3rd LIFT SHUTTERING WORK UNDER PROGRESS
91/100
Instream Storage Structure, Khirasasan
View showing flow of river from U/S to D/S of river.
92/100
Instream Storage Structure across river Sapei near village Kinjirma
Concreting of Panel no 69 in presence of IEE, QCE of PMC Sambalpur and dept. AEE & JE
93/100
Instream Storage Structure across river Sapei near village Kinjirma
Concreting of Panel no 69 in presence of IEE, QCE of PMC Sambalpur and dept. AEE & JE
94/100
Instream Storage Structure across river Sapei near village Kinjirma
Slump 80mm
95/100
Instream Storage Structure across river Sapei near village Kinjirma
Slump- 80mm for Panel no. 69
96/100
Instream Storage Structure across river Sapei near village Kinjirma
Reinforcement work is going on
97/100
Instream Storage Structure across river Sapei near village Kinjirma
IEE and Geologist of PMC Sambalpur visited the site in presence of departmental AEE,AE & JE .
98/100
Instream Storage Structure across river Sapei near village Kinjirma
IEE and Geologist of PMC Sambalpur visited the site in presence of departmental AEE,AE & JE .
99/100
Instream Storage Structure across river Sapei near village Kinjirma
After completion of excavation of RHS u/s panel no 74 the reinforcement work now completed after proper d- watering casting work will be taken up shortly . Total 13 number of labourers are engaged in the work . No other activity is seen at the site .
100/100
Instream Storage Structure, Gochara
View showing flow of river from U/S to D/S of river.

Forgot Password

Email will be sent with a new password. Back to login