PMIS for ISS/MMIPs/UGPL Projects

Total No of Schemes – 53 nos ( ISS-46, MMIPs-6, UGPL-1 )
1/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 85 mm) of Pier No-1, 13th lift done in presence of Client & PSS Team.
2/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of Pier No-1, 13th lift is under progress in presence of Client & PSS Team.
3/100
Instream Storage Structure, Hamirpur
Barrage Bay Gate installation and hoist Bridge platform installation work in presence of Client & PSS team.
4/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 21.78/mm2 for 07 days) of Pier No-4, 4th lift and (Strength is 31.04/mm2 for 28 days) of U/S Flared out wall Raft at Block No-1 and (Strength is 21.48/mm2 for 07 days) of U/S Abutment (A1) and M30A20 (Strength is 37.93/mm2 for 28 days) of Groove 2nd stage, 5th lift (Bay No-9) has done in presence of Client & PSS team.
5/100
Instream Storage Structure, Hamirpur
Observed of Sieve analysis of Coarse aggregate (10mm & 20mm) and Fine aggregate in presence of Client & PSS team along with EPC agency.
6/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-3, 12th lift is under progress.
7/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Gantry Girder is under progress.
8/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-2, 13th lift is under progress.
9/100
Instream Storage Structure, Hamirpur
Shuttering of D/S Abutment (A1), 11th lift at Block No-1 is under progress.
10/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for U/S Flank wall, 4th lift at Block No-1 is under progress.
11/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Slump testing M25A20 (Value 90 mm) of LHS Divide wall Glacis portion done in presence of Client & PSS Team.
12/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Concreting M25A20 of LHS Divide wall Glacis portion is under progress in presence of Client & PSS Team.
13/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
RHS Deck slab Girder placing work in progress.
14/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Slump testing M25A20 (Value 80 mm) of LHS U/S Divide wall, 3rd lift done in presence of Client & PSS Team.
15/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Concreting M25A20 of LHS U/S Divide wall, 3rd lift is under progress in presence of Client & PSS Team.
16/100
Instream Storage Structure, Khalpal
Slump testing M20A20 (Value 90 mm) of Barrage Bay No-2 Gravity floor done in presence of Client & PSS Team.
17/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Barrage Bay No-2 Gravity floor is under progress in presence of Client & PSS Team.
18/100
Instream Storage Structure, Khalpal
Slump testing M25A20 (Value 90 mm) of Pier No-15 (Starter) done in presence of Client & PSS Team.
19/100
Instream Storage Structure, Khalpal
Concreting M25A20 of Pier No-15 (Starter) is under progress in presence of Client & PSS Team.
20/100
Instream Storage Structure, Khalpal
Shuttering of RHS Pier No-25, 3rd lift is under progress.
21/100
Instream Storage Structure, Khalpal
Testing of Compressive M20A20 (Strength is 29.93/mm2 for 28 days) of Barrage Bay No-3 Gravity floor has done in presence of Client & PSS team.
22/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
23/100
UGPL, Right Lower Suktel Canal Division
Excavation work is in progress for Laying of 280mm Dia HDPE pipe Junction in between J 8083 to J 8043 at village Charbahali in presence of PMC team and EPC Officials.
24/100
Instream Storage Structure, Gudvella
Today the Revenue Inspector and Amin of Jamut under Tusura Tahsil, Balangir District visited ISS Gudvella for the demarcation of the A2-side approach road. The demarcation was carried out in the presence of the Department JE, PMC Site Engineer, Agency Site Engineer and local villagers on 25.06.2026
25/100
Instream Storage Structure, Gudvella
Today the Revenue Inspector and Amin of Jamut under Tusura Tahsil, Balangir District visited ISS Gudvella for the demarcation of the A2-side approach road. The demarcation was carried out in the presence of the Department JE, PMC Site Engineer, Agency Site Engineer and local villagers on 25.06.2026
26/100
Instream Storage Structure, Gudvella
Plastering work is in progress at 1st floor building on 25.06.2026
27/100
Instream Storage Structure, Gudvella
Grinding work of the Stoplog Gate is in progress on 25.06.2026
28/100
Instream Storage Structure, Gudvella
The fitting of the rope drum cover is in progress on 25.06.2026
29/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 25.06.2026
30/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 25.06.2026
31/100
Instream Storage Structure, Nandagaon
M35 A20 grade casting 2nd stage concrete at pier no. 10,11,12 & 13 on dated 28/05/26 & testing on dated 25/06/26 (28day) in presence of above technical person the ave valve of cube strength is 44.89N/mm2 on 25.06.2026
32/100
Instream Storage Structure, Nandagaon
M25 A20 grade concrete casting of control room basement slab in presence of SDO ISS Nandagaon & QC exp. Sr site engineering, site engineering of Pmc & site engineering of EPC agency. The slump value checked at casting is 85mm on 25.06.2026
33/100
Instream Storage Structure, Nandagaon
M25 A20 grade concrete casting of control room basement slab in presence of SDO ISS Nandagaon & QC exp. Sr site engineering, site engineering of Pmc & site engineering of EPC agency. The slump value checked at casting is 85mm on 25.06.2026
34/100
Instream Storage Structure, Nandagaon
• Site visit of ISS Nandagaon by QAC, Expert, SHEE, Sr. Site Engineer of PMC and SDO ISS ,Nandagaon today on dt. 25.06. 2026 in presence of all site Engineers of PMC and EPC Agency and PM of EPC Agency. The following activities are in progress: 1.The area of placing concrete for basment slab of office building have been checked before placement in presence of PM of EPC Agency, Site Engineers of PMC & EPC Agency as follows: (i).The reinforcement in binding,placing and tying of basment slab of office building monolithic with 2-legged stirrups of plinth beam are found completed. (ii).Rigid & smooth shuttering and maintained clear cover of 20mm from main bar to shutter plates for basment slab are done. (iii).The area is cleaned and passed by SE, KID, Bhawanipatna for placing with RCC M25A20 grade on 25.06.2026
35/100
Instream Storage Structure, Nandagaon
The erection work has been stopped at the site today due to labour issues on 25.06.2026
36/100
Instream Storage Structure, Nandagaon
River flow are passing through both undersluice bays area on 25.06.2026
37/100
Instream Storage Structure, Nandagaon
Reinforcement binding & shuttering is in progress at D/S right flank wall on 25.06.2026
38/100
UGPL, Right Lower Suktel Canal Division
Approach channel bed level mud cleaning work is in progress at Pump House.
39/100
UGPL, Left Lower Suktel Canal Division
Excavation work is in progress of 160mm Dia HDPE pipeline between J-338 to LO-131, LM-6 near village Bianrpali in presence of PMC team.
40/100
Instream Storage Structure, Hamirpur
Curing of Flank wall at Block No-1 is under progress.
41/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 31.08/mm2 for 28 days) of Pier No-6, 14th lift and (Strength is 30.87/mm2 for 28 days) of Pier No-26, 13th lift and M35A20 (Strength is 37.63/mm2 for 07 days) of Gantry Girder No-38 has done in presence of Client & PSS team.
42/100
Instream Storage Structure, Hamirpur
Column base plate with stiffener welding work is in progress at (Bay No-25).
43/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-3, 12th lift is under progress.
44/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-1, 14th lift is under progress.
45/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-2, 12th lift is under progress.
46/100
Instream Storage Structure, Hamirpur
Shuttering & Binding of reinforcement for D/S Abutment (A1), 11th lift at Block No-1 is under progress.
47/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-4, 5th lift is under progress.
48/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Slump testing M25A20 (Value 80 mm) of RHS Double pier, 3rd lift done in presence of Client & PSS Team.
49/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Concreting M25A20 of RHS Double pier, 3rd lift is under progress in presence of Client & PSS Team.
50/100
Instream Storage Structure, Jharbeda
Testing of Compressive M25A20 (Strength is 21.92/mm2 for 07 days) of Pier No-7, Pier Cap has done in presence of Client & PSS team.
51/100
Instream Storage Structure, Khalpal
Joint verification for tree enumeration & valuation conducted by Forest Department, Revenue Department, and Horticulture Department as well as DoWR Department.
52/100
Instream Storage Structure, Khalpal
Testing of Compressive M25A20 (Strength is 34.14/mm2 for 28 days) of Barrage Bay No-2 Raft and (Strength is 33.83/mm2 for 28 days) of LHS U/S Divide wall, 2nd lift has done in presence of Client & PSS team.
53/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
54/100
Barrage across river Turi & Guntat
Construction of Control room at Turi site is in progress.
55/100
Barrage across river Turi & Guntat
Mechanical works in progress at Turi guntat Barrage.
56/100
Instream Storage Structure, Gudvella
The launching of one part of the Stoplog Gate is currently in progress on 24.06.2026
57/100
Instream Storage Structure, Gudvella
Plastering work is in progress at 1st floor building on 24.06.2026
58/100
Instream Storage Structure, Gudvella
Covering work of roller drum is under progress at mechanical site on 24.06.2026
59/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 24.06.2026
60/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 24.06.2026
61/100
Instream Storage Structure, Nandagaon
River flood water reached at site, U/S view on 24.06.2026
62/100
Instream Storage Structure, Nandagaon
River flood water reached at site, U/S view on 24.06.2026
63/100
Instream Storage Structure, Nandagaon
The erection work and painting work has been stopped at the site today due to labour issues on 24.06.2026
64/100
Instream Storage Structure, Nandagaon
The erection work and painting work has been stopped at the site today due to labour issues on 24.06.2026
65/100
Instream Storage Structure, Nandagaon
Reinforcement binding & shuttering is in progress at D/S right flank wall on 24.06.2026
66/100
UGPL, Right Lower Suktel Canal Division
OCS chamber Below NGL installation work is in progress of OCS No. 0213119-C19A at village RakshiMunda in presence of DoWR SE, SDO, JE and PMC team.
67/100
UGPL, Right Lower Suktel Canal Division
Approach channel bed level cleaning work is in progress at Pump House in presence of PMC team.
68/100
UGPL, Right Lower Suktel Canal Division
OCS chamber door and angle fixing work is in progress OCS No-: 2305216- C01B at village Adakata in presence of PMC team.
69/100
UGPL, Right Lower Suktel Canal Division
Internal drain bottom portion grading work is in progress at Pump House in presence of PMC team.
70/100
UGPL, Left Lower Suktel Canal Division
Excavation work is in progress of Dia 160mm HDPE pipeline between J-338 to LO-131, LM-6 near village Bianrpali in presence of PMC team.
71/100
UGPL, Left Lower Suktel Canal Division
DI to HDPE connection work is in progress at Rm-4 J-358, near village Khaliapali.
72/100
Instream Storage Structure, KansariGanda
Visit of Irrigation eng. expert along with Site engineer PMC to the ISS site. Inspected the Wearing Coat to Zone No 6 to 3 of Barrage Bay No 3 with PCC and Cube test conducted at site.
73/100
Instream Storage Structure, KansariGanda
Visit of Irrigation eng. expert along with Site engineer PMC to the ISS site. Inspected the Wearing Coat to Zone No 6 to 3 of Barrage Bay No 3 with PCC and Cube test conducted at site.
74/100
Instream Storage Structure, KansariGanda
Visit of Irrigation eng. expert along with Site engineer PMC to the ISS site. Inspected the Wearing Coat to Zone No 6 to 3 of Barrage Bay No 3 with PCC and Cube test conducted at site.
75/100
UGPL, Right Lower Suktel Canal Division
Joint verification work is in progress of OCS no-0201219-C-05A at village Kutumdola in presence of DoWR SE, SDO, JE, PMC team and EPC officials.
76/100
Instream Storage Structure, Jharbeda
Slump testing M25A20 (Value 85 mm) of RHS (D2) Middle pier portion, 2nd lift done in presence of Client & PSS Team.
77/100
Instream Storage Structure, Jharbeda
Concreting M25A20 of RHS (D2) Middle pier portion, 2nd lift is under progress in presence of Client & PSS Team.
78/100
Instream Storage Structure, Jharbeda
Shuttering of RHS U/S Training wall, 2nd lift is under progress.
79/100
Instream Storage Structure, Jharbeda
Shuttering of Pier No-7, pier Cap is under progress.
80/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 21.48/mm2 for 07 days) of Abutment (A1), 10th lift and (Strength is 21.63/mm2 for 07 days) of Pier No-1, 11th lift and M15A40 (Strength is 13.33/mm2 for 07 days) of D/S Flank Cut-off wall at Block No-1 (PCC) has done in presence of Client & PSS team.
81/100
Instream Storage Structure, Gudvella
Installation of dial indicator is under progress at mechanical site on 23.06.2026
82/100
Instream Storage Structure, Hamirpur
Wire ropes fixing work is in progress of hoist bridge platform.
83/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-3, 11th lift is under progress.
84/100
Instream Storage Structure, Gudvella
Installation work of door at 1st floor building is under progress at site on 23.06.2026
85/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-2, 11th lift is under progress.
86/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for D/S Abutment (A1), 11th lift at Block No-1 is under progress.
87/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-1, 12th lift is under progress.
88/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 23.06.2026
89/100
Instream Storage Structure, Khalpal
Slump testing M25A20 (Value 85 mm) of Pier No-14 (Starter) done in presence of Client & PSS Team.
90/100
Instream Storage Structure, Khalpal
Concreting M25A20 of Pier No-14 (Starter) is under progress in presence of Client & PSS Team.
91/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
92/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 23.06.2026
93/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade of 2nd stage concrete at right abutment for 11th lift is in progress in presence of PM EPC agency, Site Engineer's of PMC & EPC agency. The slump test value is 85mm on 23.06.2026
94/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade of 2nd stage concrete at right abutment for 11th lift is in progress in presence of PM EPC agency, Site Engineer's of PMC & EPC agency. The slump test value is 85mm on 23.06.2026
95/100
Instream Storage Structure, Nandagaon
Reinforcement binding for basement slab of office building is in progress on 23.06.2026
96/100
Instream Storage Structure, KansariGanda
Curing continuing at site.
97/100
Instream Storage Structure, KansariGanda
Curing continuing at site.
98/100
Instream Storage Structure, Nandagaon
Reinforcement binding & Shuttering is in progress at D/S right flank wall on 23.06.2026
99/100
Instream Storage Structure, Nandagaon
• 1. Fixing & fittings and alignment of 2nd. stage embedded parts and numbers of dowel bars provided as per approved drawing at roller tracks of both stop log & service gate grooves at bay no.14 of right abutment for 11th lift have been checked and found correct by HM Expert of PMC during his site visit on dt.01.06.2026 in presence of all civil n mechanical Site Engineers of PMC and EPC Agency as per the approved Mechanical drawing & designs. (i) Accordingly the rigid n smooth shuttering for placing the 2nd. Stage concrete is completed as follows: (ii) Chipping of old vertical concrete surface is done. (iii).The area is cleaned properly through water pressure and passed by SE, KID, Bhawanipatna for M35A20 grade on 23.06.2026
100/100
Instream Storage Structure, KansariGanda
Slump cone test conducted at site.