1/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Slump testing M25A20 (Value 85 mm) of D/S Wing wall done in presence of Client & PSS Team.
2/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Concreting M25A20 of D/S Wing wall is under progress in presence of Client & PSS Team.
3/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Shuttering of RHS Double Pier, 5th lift is under progress.
4/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Binding of reinforcement for LHS side Raft is under progress.
5/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Slump testing M25A20 (Value 80 mm) of RHS Divide wall, 2nd lift done in presence of Client & PSS Team.
6/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Concreting M25A20 of RHS Divide wall, 2nd lift is under progress in presence of Client & PSS Team.
7/100
Instream Storage Structure, Jharbeda
Slump testing M25A20 (Value 90 mm) of RHS (D2) Pier portion Footing, 1st lift done in presence of Client & PSS Team.
8/100
Instream Storage Structure, Jharbeda
Concreting M25A20 of RHS (D2) Pier portion Footing, 1st lift is under progress in presence of Client & PSS Team.
9/100
Instream Storage Structure, Jharbeda
Cleaning of RHS (D2) Pier portion work is under progress.
10/100
Instream Storage Structure, Jharbeda
Curing of End sill is under progress.
11/100
Instream Storage Structure, Jharbeda
Cleaning work is under progress.
12/100
Instream Storage Structure, Jharbeda
Curing of Training wall is under progress.
13/100
Instream Storage Structure, Hamirpur
Slump testing M35A20 (Value 85 mm) of Gantry Girder No-25 done in presence of Client & PSS Team.
14/100
Instream Storage Structure, Hamirpur
Concreting M35A20 of Gantry Girder No-25 is under progress in presence of Client & PSS Team.
15/100
Instream Storage Structure, Hamirpur
Slump testing M15A40 (Value 40 mm) of D/S Toe wall, 3rd lift at Block No-5 done in presence of Client & PSS Team.
16/100
Instream Storage Structure, Hamirpur
Concreting M15A40 of D/S Toe wall, 3rd lift at Block No-5 is under progress in presence of Client & PSS Team.
17/100
Instream Storage Structure, Hamirpur
Both side Barrage bay groove 2nd stage embedded parts roller track and side guide erection work is in progress at bay No-10.
18/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 21.63/mm2 for 07 days) of Pier No-4, 2nd lift and (Strength is 21.33/mm2 for 28 days) of Pier No-21, 14th lift and M15A40 (Strength is 20.63/mm2 for 28 days) of Flared Cut-off wall at Block No-1 (PCC) and M35A20 (Strength is 41.93/mm2 for 28 days) of Cross Girder (Bay No-21) has done in presence of Client & PSS team.
19/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Deck slab (Bay No-16) is under progress.
20/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-1, 6th lift is under progress.
21/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for D/S Flank wall Raft at Block No-5 is under progress.
22/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Gantry Girder is under progress.
23/100
Instream Storage Structure, Khalpal
Slump testing M20A20 (Value 85 mm) of Barrage Bay No-3 Gravity floor done in presence of Client & PSS Team.
24/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Barrage Bay No-3 Gravity floor is under progress in presence of Client & PSS Team.
25/100
Instream Storage Structure, Khalpal
Inspection of Principal Secretary, Water Resources Department, Govt. of Odisha to ISS Khalpal along with Addl. C.E, S.E, AID & PSS team.
26/100
Instream Storage Structure, Gudvella
Casting of deck slab railing and posts of D/s side of span -7 is in progress at site on 23.04.2026
27/100
Instream Storage Structure, Gudvella
Manorail girder installation work under progress on 23.04.2026
28/100
Instream Storage Structure, Gudvella
Paint work is under progress on 23.04.2026
29/100
Instream Storage Structure, Gudvella
Shuttering work under progress at parapet posts on 23.04.2026
30/100
Instream Storage Structure, Gudvella
Manorail girder installation work under progress at P1 to P2 on 23.04.2026
31/100
Instream Storage Structure, Gudvella
Under-sluice gate no - 2 assembly work under progress on 23.04.2026
32/100
Instream Storage Structure, Gudvella
Shuttering work is under progress of the slab at the 1st floor of the building on 23.04.2026
33/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M25A20 grade at U/S right divide wall for 6th lift upto RL-239.60m is in progress through concrete pump in presence of PM EPC agency, Site Engineer of PMC & EPC agency. The slump test value is 88mm on 23.04.2026
34/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M25A20 grade at U/S right divide wall for 6th lift upto RL-239.60m is in progress through concrete pump in presence of PM EPC agency, Site Engineer of PMC & EPC agency. The slump test value is 88mm on 23.04.2026
35/100
Instream Storage Structure, Nandagaon
• 3.The area of placing concrete at U/S right divide wall has been checked before placement in presence of PM of EPC Agency, Site Engineer of PMC & EPC Agency as follows:
(i).The reinforcement in binding, tying n spacing of both vertical main & horiz. dist. bar and tie bars for casting of U/S right divide wall for 6th lift from RL-238.20m to RL-239.60m are found completed.
(ii).Rigid & smooth shuttering and maintained clear cover of 75mm from main bar to shutter plates are done.
iii).The area is cleaned properly through air water jetting and passed by SE, KID, Bhawanipatna for placing with RCC M25A20 grade on 23.04.2026
36/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M35A20 grade of right kerb at deck slab no. 10&11 upto RL-247.30m is in progress in presence of PM EPC agency, Site Engineer of PMC & EPC agency. The slump test value is 84mm on 23.04.2026
37/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M35A20 grade of right kerb at deck slab no. 10&11 upto RL-247.30m is in progress in presence of PM EPC agency, Site Engineer of PMC & EPC agency. The slump test value is 84mm on 23.04.2026
38/100
Instream Storage Structure, Nandagaon
• 2.The area before placement of concrete for right kerb of deck slab has been checked in presence of PM,EPC agency,Site Engineers of PMC & EPC agency as follows:
(i)Binding of 8mm dia 2-legged stirrups for left kerb at deck slab of Span- 10 & 11 and fixing of rail posts bars are completed.
(ii) Rigid and smooth shuttering with 40mm clear cover are completed.
(iii)Fixing & placing of joint materials at pier-9&10 along the expansion gap is done.
(iv) Area is cleaned using air water jet and passed by SE, KID, Bhawanipatna and ready to place concrete with RCC M35A20 grade upto RL-247.30m on 23.04.2026
39/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M25A20 grade of column foundation nos. 1 to 15 for building upto RL-240.95m is in progress through concrete pump in presence of DTL, Tel basin Bhawanipatna, QAC Expert, SHEE & Sr. Site Engineer of PMC, PM EPC agency, Site Engineer of PMC & EPC agency on 23.04.2026
40/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M25A20 grade of column foundation nos. 1 to 15 for building upto RL-240.95m is in progress through concrete pump in presence of DTL, Tel basin Bhawanipatna, QAC Expert, SHEE & Sr. Site Engineer of PMC, PM EPC agency, Site Engineer of PMC & EPC agency on 23.04.2026
41/100
Instream Storage Structure, Nandagaon
• 1.The area of placing concrete at foundation of column footing base of 16nos. of Office building have been checked before placement in presence of PM of EPC Agency, Site Engineer of PMC & EPC Agency as follows:
(i).The reinforcement of foundation 12mm dia @ 150 c/c in both way for column base vertical reinforcements, pedestal bars 10mm dua @150mm c/c & 8 mm dia stirrups @ 150mm c/c of 0.350n ht. from RL-240.60m to RL-240.95m are found completed as per the approved drawings and design.
(ii).Rigid & smooth shuttering and maintained clear cover of 50mm from main bar to shutter plates are done.
(iii).The area is cleaned and passed by SE, KID, Bhawanipatna for placing with RCC M25A20 grade on 23.04.2026
42/100
Instream Storage Structure, Nandagaon
Site visit of ISS, Nandagaon by DTL,Tel Basin, Bhawanipata along with QAC, Expert, SHEE and Sr. Site Engineer of PMC in dt. 23.04.2026 in presence of PM of EPC, Agency, Site Engineers of PMC and EPC Agency. Observations/suggetions are made during visit as follows: 1. Reinforcements in binding, placing, tying n link bars of 16nos. columns base footing, pillars and pedestals including rigid and smooth shuttering for each foundation footing of Office building are checked n found completed as per the approved drawings, design & specifications. 2. Reinforcements in binding, placing, tying n providing cover blocks including rigid and smooth shuttering are completed for 6th lift of U/S right Divide wall and the area will be get ready for placing concrete with RCC M25A20 grade after cleaning the bottom surface through air water jet on 23.04.2026
43/100
Instream Storage Structure, Nandagaon
Site visit of ISS, Nandagaon by DTL,Tel Basin, Bhawanipata along with QAC, Expert, SHEE and Sr. Site Engineer of PMC in dt. 23.04.2026 in presence of PM of EPC, Agency, Site Engineers of PMC and EPC Agency. Observations/suggetions are made during visit as follows: 1. Reinforcements in binding, placing, tying n link bars of 16nos. columns base footing, pillars and pedestals including rigid and smooth shuttering for each foundation footing of Office building are checked n found completed as per the approved drawings, design & specifications. 2. Reinforcements in binding, placing, tying n providing cover blocks including rigid and smooth shuttering are completed for 6th lift of U/S right Divide wall and the area will be get ready for placing concrete with RCC M25A20 grade after cleaning the bottom surface through air water jet on 23.04.2026
44/100
Instream Storage Structure, Nandagaon
M20A20 & M25 A20 grade concrete casting on dated 16/04/26 at D/S right flared out wall CC block and tested on dated 23/04/26(7day) the ave valve of comp. strength of cube is 20.29N/mm2 & 22.22N/mm2 respectively checked in presence of DTL, QC exp, Sr site engineering, site engineering of Pmc and site engineering of EPC agency on 23.04.2026
45/100
Instream Storage Structure, Nandagaon
Shuttering for Blockout portion is in progress on 23.04.2026
46/100
Instream Storage Structure, Nandagaon
Reinforcement binding & Shuttering for right kerb at deck slab on 23.04.2026
47/100
Instream Storage Structure, Nandagaon
Reinforcement binding & Shuttering is in progress at U/S right divide wall on 23.04.2026
48/100
Instream Storage Structure, Nandagaon
Columns sand blasting work under progress on 23.04.2026
49/100
Instream Storage Structure, Nandagaon
Columns, Trestle, Stiffener painting work under progress on 23.04.2026
50/100
UGPL, Right Lower Suktel Canal Division
Inspected of BFV and BFV Chamber is in progress for 180mm DIa HDPE pipe from J 8021 to J-8099 (p-8096) at village Rakshimilunsa.
51/100
UGPL, Right Lower Suktel Canal Division
Bermad equipment installation work is in progress of OCS No- 0213094-C13A near village Randa in presence of PMC team.
52/100
UGPL, Right Lower Suktel Canal Division
Excavation work is in progress for Outlet fixing of OCS no 0201316- C04B at village Madhiapali in presence of PMC team.
53/100
UGPL, Right Lower Suktel Canal Division
Valve Chamber Pre-cast slab reinforcement binding work is in progress of Pump House.
54/100
UGPL, Right Lower Suktel Canal Division
OCS chamber door & angle fixing work is in progress OCS No:-0213087-C11B at village Lakhapali in presence of PMC team.
55/100
UGPL, Left Lower Suktel Canal Division
HDPE Tee (180 X 125 X 160)mm connection work is in progress at J-189, LM-5, near village Mandiapadar in presence of PMC team.
56/100
Barrage across river Turi & Guntat
Site inspection at the Turi–Guntat Barrage was carried out by the Collector , Tahasildar accompanied by, SDO, JEs, and PMC DTL , site engineer and the agency representative.
57/100
UGPL, Left Lower Suktel Canal Division
350mm Dia DI pipeline laying work is in progress of Mala crossing area from J- 30 to J- 413, LM - 5 near village Mandiapadar in presence of DoWR SDO, JE and PMC team.
58/100
Instream Storage Structure, Kuakhai
Casting of PCC M15A20 at left D/S Flared-out wall from RL 6.5m to 8.00m is under progress.
59/100
Instream Storage Structure, Kuakhai
Casting of PCC M15A20 at left D/S Flared-out wall from RL 6.5m to 8.00m is under progress.
60/100
Instream Storage Structure, Kuakhai
Casting of D/S CC Blocks is under progress.
61/100
Instream Storage Structure, Kuakhai
Slump test done at site, slump value is 95mm.
62/100
Instream Storage Structure, Kuakhai
Reinforcement binding and shuttering at pier no.3, 4, 5 & 6 is under progress.
63/100
Instream Storage Structure, Kuakhai
Casting of left block abutment portion (zone-3&4) from RL 15.75m to 17.05m is under progress.
64/100
Instream Storage Structure, Kuakhai
Casting of PCC M15A20 at left D/S flared-out wall raft balance portion from RL 6.5m to 8.00m is under progress.
65/100
Instream Storage Structure, Kuakhai
Casting of D/S CC Blocks is under progress.
66/100
Instream Storage Structure, Kuakhai
Casting of flared out wall, 2nd lift from RL 9.5m to 10.5m is completed.
67/100
Instream Storage Structure, Kuakhai
Shuttering of left side D/S flared-out wall raft is under progress.
68/100
Instream Storage Structure, Kuakhai
Casting of left block U/S flared out wall from RL 10.5m to 11.5m is under progress.
69/100
Instream Storage Structure, Kushabhadra
Right U/S flared-out wall shuttering work in progress.
70/100
Instream Storage Structure, Kuakhai
Shuttering of D/S CC Blocks is under progress.
71/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
72/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
73/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
74/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
75/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
76/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
77/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
78/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
79/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
80/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
81/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
82/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
83/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
84/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
85/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
86/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
87/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
88/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
89/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
90/100
Instream Storage Structure, Kuakhai
Shuttering of D/S curtain wall is under progress.
91/100
Instream Storage Structure, Kuakhai
Reinforcement binding at left D/S flank wall portion is under progress.
92/100
Instream Storage Structure, Kuakhai
Ongoing casting of PCC M15A20 in left side U/S flared-out wall from RL 11.5m to 12.5m is under progress.
93/100
Instream Storage Structure, Kuakhai
Casting of PCC M15A20 in let D/S Flared-out wall from RL 8.00m to 9.00m is under progress.
94/100
Instream Storage Structure, Kuakhai
Slump test done at site, Slump value is 90mm.
95/100
Instream Storage Structure, Kuakhai
Casting of RCC M25A20 in pier no.4 from RL 18.95m to 20.35m (8th lift) is under progress.
96/100
Instream Storage Structure, Kuakhai
Casting of Left side U/S flared-out wall from RL 10.5m to 11.5m is under progress.
97/100
Instream Storage Structure, Kuakhai
Casting of Left side U/S flared-out wall from RL 8.5m to 12.00m is under progress.
98/100
Instream Storage Structure, Kuakhai
Casting of Left side U/S flared-out wall from RL 8.5m to 12.00m is under progress.
99/100
Instream Storage Structure, Kuakhai
Ongoing Casting of 1st D/S curtain wall.
100/100
Instream Storage Structure, Kuakhai
Reinforcement binding at pier no. 2 & 4 is under progress.
❮
❯