GOVERNMENT OF ODISHA

DEPARTMENT OF WATER RESOURCES

PMIS for ISS/MMIPs/UGPL Projects

Total No of Schemes – 53 nos ( ISS-46, MMIPs-6, UGPL-1 )
1/100
Instream Storage Structure, Budharaja
Curing Work is in Progress.
2/100
Instream Storage Structure, Budharaja
De-Shuttering work is in Progress at LHS U/S Flared-out Wall, 22nd Step. RL: 218.300 to 218.900.
3/100
Instream Storage Structure, Budharaja
De-Shuttering work is in Progress at LHS U/S Flared-out Wall, 22nd Step. RL: 218.300 to 218.900.
4/100
Instream Storage Structure, Budharaja
Curing Work is in Progress.
5/100
Instream Storage Structure, Budharaja
Curing work is in progress.
6/100
Instream Storage Structure, Budharaja
Shuttering work is in Progress at LHS U/S Flared-out Wall, 22nd Step. RL: 218.300 to 218.900.
7/100
Instream Storage Structure, Budharaja
Slump Value: 80mm
8/100
Instream Storage Structure, Budharaja
Slump Value: 80mm
9/100
Instream Storage Structure, Budharaja
No-1 STOPLOG GATE Erection work under progress 7 Nos of Hoist bridge installation completed out of 11
10/100
Instream Storage Structure, Budharaja
Sir, checked placing and positioning of steel reinforcement, supporting bars and alignment of shuttering work with minimum cover 25mm for Slab & 40mm for Beam. Staff Quarter, 1st Floor Slab. Now the area is ready for concrete M25 A20. So recommended for the purpose. RL:226.600 to 226.725. Approved by SE SID Sambalpur, In presence of Department JE.
11/100
Instream Storage Structure, Budharaja
SE SID Sambalpur inspected ISS Budharaja.PMC team Sambalpur & other Departmental officers were present. Instructed to complete the Balance work within targeted time line.
12/100
Instream Storage Structure, Budharaja
Sample collection of sand
13/100
Instream Storage Structure, Budharaja
Hoist bridge 5 Nos. installation work done out of 11 in Bay No-5
14/100
Instream Storage Structure, Budharaja
Angel joint both hoist column in pier No-4
15/100
Instream Storage Structure, Budharaja
Shuttering work is in Progress at LHS U/S Flared-out Wall, 21nd Step. RL: 217.700 to 218.300.
16/100
Instream Storage Structure, Budharaja
No-3 Hoist bridge erection work in progress
17/100
Instream Storage Structure, Budharaja
Shuttering work is in Progress at LHS U/S Flared-out Wall, 21nd Step. RL: 217.700 to 218.300.
18/100
Instream Storage Structure Across Bheden near village Saida
ISS SAIDA Undersluice Bay no-2 both Barrage Bay Gate & StopLog gate Sill beam all measurements checked as per approved drawings, Spirit level & water level checked.
19/100
Instream Storage Structure Across Bheden near village Saida
ISS SAIDA Undersluice Bay no-2 both Barrage Bay Gate & StopLog gate Sill beam all measurements checked as per approved drawings, Spirit level & water level checked.
20/100
Instream Storage Structure Across Bheden near village Saida
RHS D/S Flank wall 5th lift de-shuttering work & 6th lift shuttering work is going on .
21/100
Instream Storage Structure Across Bheden near village Saida
RHS Undersluice Deck slab staging work is in progress .
22/100
Instream Storage Structure Across Bheden near village Saida
De-Shuttering work progress in RHS u/s flared out wall step-7 & Shuttering work progress in step -8
23/100
Instream Storage Structure Across Bheden near village Saida
De-Shuttering work progress in LHS d/s flared out wall step-13 & Shuttering work progress in step -14
24/100
Instream Storage Structure Across Bheden near village Saida
RHS under sluice deck slab staging work in progress
25/100
Instream Storage Structure Across Bheden near village Saida
RHS under sluice deck slab staging work in progress
26/100
Instream Storage Structure Across Bheden near village Saida
De-Shuttering work progress in LHS d/s flared out wall step-13
27/100
Instream Storage Structure Across Bheden near village Saida
P-5 to RHS Divide wall between mid portion Deck slab staging de-shuttering work is going on .
28/100
Instream Storage Structure Across Bheden near village Saida
RHS D/S Flared out wall foundation cleaning & de-watering work is going on .
29/100
Instream Storage Structure Across Bheden near village Saida
SE SID Sambalpur inspected ISS Saida. PMC team Sambalpur & other Departmental officers were present. Instructed to complete the Balance work within targeted time line.
30/100
Instream Storage Structure Across Bheden near village Saida
Slump value - 60
31/100
Instream Storage Structure Across Bheden near village Saida
RHS U/S Flared out wall step -6th casting before
32/100
Instream Storage Structure Across Bheden near village Saida
LHS D/S Flared out wall step -13th shuttering work is going on .
33/100
Instream Storage Structure Across Bheden near village Saida
Deck slab Railing kerb shuttering work is going on .
34/100
Instream Storage Structure Across Bheden near village Saida
RHS D/S Flared out wall shuttering work is going on .
35/100
Instream Storage Structure Across Bheden near village Saida
Sand screening work is in progress .
36/100
Instream Storage Structure Across Bheden near village Saida
Railing beam placing & post shuttering work is going on .
37/100
Instream Storage Structure Across Bheden near village Saida
Deck slab Railing kerb shuttering work is going on
38/100
Instream Storage Structure, Gochara
No mechanical work activity at Site.
39/100
Instream Storage Structure, Gochara
No mechanical work activity at Site.
40/100
Instream Storage Structure, Gochara
2 no's of RDU & CDU arrived at Site.
41/100
Instream Storage Structure, Gochara
No work activity at site due to want of labourers.
42/100
Instream Storage Structure, Gochara
Water curing on staff quarter
43/100
Instream Storage Structure, Gochara
No mechanical work activity at Site.
44/100
Instream Storage Structure, Gochara
No work activity at site due to want of labourers.
45/100
Instream Storage Structure, Gochara
SE SID Sambalpur inspected ISS Gochhra.PMC team Sambalpur & other Departmental officers were present.Instructed to complete the Balance work by targeted timeline.
46/100
Instream Storage Structure, Gochara
No mechanical work activity at Site.
47/100
Instream Storage Structure, Gochara
No work activity at site due to want of labourers
48/100
Instream Storage Structure, Gochara
No other ancillary work done due to want of labourers .
49/100
Instream Storage Structure, Gochara
No mechanical work activity at Site.
50/100
Instream Storage Structure, Khirasasan
No 7 gate installation work is in progress out of 9
51/100
Instream Storage Structure, Khirasasan
6 Nos of gate installation completed out of 9 gate
52/100
Instream Storage Structure, Khirasasan
View showing flow of river from U/S to D/S of river.
53/100
Instream Storage Structure, Khirasasan
RHS U/S FLARED OUT WALL PROFILE 3rd LIFT SHUTTERING WORK IS UNDER progress
54/100
Instream Storage Structure, Khirasasan
3 Nos of gate installation completed out of 8 Nos.
55/100
Instream Storage Structure, Khirasasan
RHS U/S FLARED OUT WALL PROFILE 3rd LIFT SHUTTERING WORK IS UNDER progress.
56/100
Instream Storage Structure, Khirasasan
View showing flow of river from U/S to D/S of river.
57/100
Instream Storage Structure, Khirasasan
Gate Erection work start No -2 out of 8 gate.
58/100
Instream Storage Structure, Khirasasan
No Mechanical work activity at site
59/100
Instream Storage Structure, Khirasasan
RHS U/S FLARED OUT WALL PROFILE 3rd LIFT SHUTTERING WORK UNDER progress.
60/100
Instream Storage Structure, Khirasasan
View showing flow of river from U/S to D/S of river.
61/100
Instream Storage Structure, Khirasasan
No Mechanical work activity at site
62/100
Instream Storage Structure, Khirasasan
RHS U/S FLARED OUT WALL PROFILE 3rd LIFT SHUTTERING WORK UNDER progress
63/100
Instream Storage Structure, Khirasasan
View showing flow of river from U/S to D/S of river.
64/100
Instream Storage Structure, Khirasasan
SE SID Sambalpur inspected ISS Kirasason.PMC team Sambalpur & other Departmental officers were present. Instructed to complete the Balance work within targeted time line.
65/100
Instream Storage Structure, Khirasasan
No Mechanical work active at site
66/100
Instream Storage Structure, Kopsinga
Slump-85mm
67/100
Instream Storage Structure, Kopsinga
Cube test
68/100
Instream Storage Structure, Kopsinga
Pier no(2-3) span Expansion joint fixing work
69/100
Instream Storage Structure, Kopsinga
RHS Abutment -P1 Bottom Gate Grover cleaning work
70/100
Instream Storage Structure, Kopsinga
Slump-95mm RHS Approach slab
71/100
Instream Storage Structure, Kopsinga
RHS Approach slab Reinforcement, Shuttering with cover check in presence of Dept JE madam now the area ready for casting M35A20.
72/100
Instream Storage Structure, Kopsinga
RHS Approach road slab Shuttering work under progress
73/100
Instream Storage Structure, Kopsinga
RHS Abutment -pier 1 Gate Grover chipping work under progress
74/100
Instream Storage Structure, Kopsinga
ISS Kudabaga - Chakkar plate fixing work is in progress of Hoist-bridge
75/100
Instream Storage Structure, Kopsinga
ISS Kopsingha - 3rd Under-sluice gate's bottom part's work is in progress
76/100
Instream Storage Structure, Kopsinga
Double storied building plinth beam Deshuttering work
77/100
Instream Storage Structure, Kopsinga
RHS Approach road slab Reinforcement work
78/100
Instream Storage Structure, Kopsinga
Cube test ISS Kopsingha
79/100
Instream Storage Structure, Kopsinga
ISS Kopsingha - Seal-beam fixing work is in progress for Barrage gate's or Service gate's at Span no - 12
80/100
Instream Storage Structure, Kopsinga
Double storied building plinth beam shuttering & reinforcement checking completed now the area ready for casting M30/A20
81/100
Instream Storage Structure, Kopsinga
Double storied building plinth beam shuttering work is under progress
82/100
Instream Storage Structure, Kopsinga
ISS Kopsingha - 4th-Under-sluice gate's girder's work is in progress Out of 6
83/100
Instream Storage Structure, Kopsinga
ISS Kopsingha - 2nd Under-sluice gate's bottom part's work is in progress Out of 6
84/100
Instream Storage Structure, Kudabega
Right under sluice bay fish pass portion both side hand railing post M35A20 casting work in progress
85/100
Instream Storage Structure, Kudabega
85mm
86/100
Instream Storage Structure, Kudabega
Double stored building for watchman & operator shed column M30A20 casting work in progress
87/100
Instream Storage Structure, Kudabega
Slump 85mm
88/100
Instream Storage Structure, Kudabega
RHS U/S flared wall sec 6-6 M20A20 casting work in progress
89/100
Instream Storage Structure, Kudabega
Slump 80mm
90/100
Instream Storage Structure, Kudabega
RHS D/S flared wall sec 4-4 M20A20 casting work in progress
91/100
Instream Storage Structure, Kudabega
U/S sluice bay toe wall bottom base excavation work in progress
92/100
Instream Storage Structure, Kudabega
Flared wall RHS D/S section 2/2 17th step shuttering work in progress
93/100
Instream Storage Structure, Kudabega
Casting of DS flared wall
94/100
Instream Storage Structure, Kudabega
RHS U/S flared wall. Slump 80mm
95/100
Instream Storage Structure, Kudabega
Slump 80mm of DS flared wall
96/100
Instream Storage Structure across river Sapei near village Kinjirma
D-watering is going on in RHS u/s divide wall (D-Wall portion) . No other ancillary work done due to want of labourers.
97/100
Instream Storage Structure across river Sapei near village Kinjirma
D-watering is going on in RHS u/s divide wall (D-Wall portion) . No other ancillary work done due to want of labourers.
98/100
Instream Storage Structure across river Sapei near village Kinjirma
D-watering is going on in RHS U/S divide wall (D-Wall portion) . No other ancillary work done due to want of labour.
99/100
Instream Storage Structure across river Sapei near village Kinjirma
IEE and Geologist of PMC Sambalpur visited the site in presence of departmental AEE & AE .
100/100
UGPL, Left Lower Suktel Canal Division
Stem pipe Encasing Reinforcement binding work is in progress at RO-23A RM-2 Near village Kusmel In Presence of PMC team .