Total No of Schemes – 53 nos ( ISS-46, MMIPs-6, UGPL-1 )
1/100
UGPL, Right Lower Suktel Canal Division
Excavation work is in progress for laying of 75mm Dia HDPE pipe of OCS No- 0201214-C05B for sub chak No-9 At village Buxiudar in presence of PMC team.
2/100
Instream Storage Structure, Gudvella
Brick work at headroom area of building is under progress at site on 28.06.2026
3/100
Instream Storage Structure, Gudvella
Minor mechanical grinding works are currently in progress on 28.06.2026
4/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 28.06.2026
5/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 28.06.2026
6/100
Instream Storage Structure, Gudvella
Today officials from the Gudvella Forest Section visited the ISS Gudvella site to inspect the sal trees located along the proposed approach road. The inspection was conducted to assess the tree and submit a report to their higher authorities for further necessary action on 27.06.2026
7/100
Instream Storage Structure, Gudvella
Brick work at the head room of building area is under progress at site on 27.06.2026
8/100
Instream Storage Structure, Gudvella
Staircase work at mechanical yard is under progress at site on 27.06.2026
9/100
Instream Storage Structure, Gudvella
Fittup work electrical pole is under progress at site on 27.06.2026
10/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 27.06.2026
11/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 27.06.2026
12/100
Instream Storage Structure, Gudvella
Staircase work is under progress at mechanical yard on 26.06.2026
13/100
Instream Storage Structure, Gudvella
Plastering work at building area is under progress at site on 26.06.2026
14/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 26.06.2026
15/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 26.06.2026
16/100
Instream Storage Structure, Nandagaon
Shuttering for CC block is in progress at D/S right flared out wall on 28.06.2026
17/100
Instream Storage Structure, Nandagaon
Shuttering for CC block at D/S right flared out wall is in progress on 27.06.2026
18/100
Instream Storage Structure, Nandagaon
The erection work has been stopped at the site today due to labour issues on 26.06.2026
19/100
Instream Storage Structure, Nandagaon
Curing is in progress at right abutment on 26.06.2026
20/100
Instream Storage Structure, Nandagaon
Shuttering for CC block at D/S right flared out wall is in progress on 26.06.2026
21/100
Instream Storage Structure, Khalpal
Slump testing M25A20 (Value 85 mm) of LHS D/S Divide wall, 2nd lift done in presence of Client & PSS Team.
22/100
Instream Storage Structure, Khalpal
Concreting M25A20 of LHS D/S Divide wall, 2nd lift is under progress in presence of Client & PSS Team.
23/100
Instream Storage Structure, Khalpal
Shuttering of RHS Double Pier No-25, 3rd lift is under progress.
24/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
25/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Slump testing M25A20 (Value 85 mm) of RHS D/S Divide wall, 4th lift done in presence of Client & PSS Team.
26/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Concreting M25A20 of RHS D/S Divide wall, 4th lift is under progress in presence of Client & PSS Team.
27/100
Instream Storage Structure, Hamirpur
Testing of Compressive M15A40 (Strength is 20.23/mm2 for 28 days) of Flared out wall Raft PCC and (Strength is 20.89/mm2 for 28 days) of Flank wall Cut-off PCC has done in presence of Client & PSS team.
28/100
Instream Storage Structure, Hamirpur
Slump testing M35A20 (Value 90 mm) of Gantry Girder No-40 done in presence of Client & PSS Team.
29/100
Instream Storage Structure, Hamirpur
Concreting M35A20 of Gantry Girder No-40 is under progress in presence of Client & PSS Team.
30/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 21.04/mm2 for 07 days) of Pier No-3, 11th lift and (Strength is 21.63/mm2 for 07 days) of Pier No-5, 4th lift and M35A20 (Strength is 37.63/mm2 for 07 days) of Deck slab (Bay No-10 &11) and M30A20 (Strength is 37.78/mm2 for 28 days) of Groove 2nd stage, 9th and 1st lift (Bay No-26 & 28) has done in presence of Client & PSS team.
31/100
Instream Storage Structure, Hamirpur
Barrage bay Gate No-25 lifting trial operation work is in progress.
32/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Gantry Girder is under progress.
33/100
Instream Storage Structure, Hamirpur
Gantry girder's 1st stage embedded plate fixing and welding work is in progress.
34/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for D/S Flank wall Raft at Block No-1 is under progress.
35/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-4 & 5, 5th lift is under progress.
36/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-1, 14th lift is under progress.
37/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-3, 13th lift is under progress.
38/100
Instream Storage Structure, Hamirpur
Shuttering & Binding of reinforcement for Abutment (A1), 12th lift at Block No-1 is under progress.
39/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for U/S Flank wall, 4th lift at Block No-1 is under progress.
40/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Slump testing M25A20 (Value 85 mm) of LHS Divide wall, 1st lift done in presence of Client & PSS Team.
41/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Concreting M25A20 of LHS Divide wall, 1st lift is under progress in presence of Client & PSS Team.
42/100
Instream Storage Structure, Khalpal
Slump testing M25A20 (Value 90 mm) of Pier No-16 (Starter) done in presence of Client & PSS Team.
43/100
Instream Storage Structure, Khalpal
Concreting M25A20 of Pier No-16 (Starter) is under progress in presence of Client & PSS Team.
44/100
Instream Storage Structure, Khalpal
Shuttering of RHS Double Pier No-25, 3rd lift is under progress.
45/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
46/100
UGPL, Right Lower Suktel Canal Division
OCS chamber above GL work is in progress of OCS No:- 0213055-C11A at village Bubel in presence of CME (PSS) PMC along with team and L&T offical.
47/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Binding of reinforcement for RHS D/S Counerfort & Abutment wall, 4th lift is under progress.
48/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 90 mm) of Pier No-3, 12th lift done in presence of Client & PSS Team.
49/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of Pier No-3, 12th lift is under progress in presence of Client & PSS Team.
50/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 21.04/mm2 for 07 days) of Pier No-3, 11th lift and (Strength is 21.63/mm2 for 07 days) of Pier No-5, 4th lift and M35A20 (Strength is 37.63/mm2 for 07 days) of Deck slab (Bay No-10 &11) and M30A20 (Strength is 37.78/mm2 for 28 days) of Groove 2nd stage, 9th and 1st lift (Bay No-26 & 28) has done in presence of Client & PSS team.
51/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-4 & 5, 6th lift is under progress.
52/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-1, 13th lift is under progress.
53/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-3, 12th lift is under progress.
54/100
Instream Storage Structure, Hamirpur
Shuttering & Binding of reinforcement for D/S Abutment (A1), 9th lift at Block No-1 is under progress.
55/100
Instream Storage Structure, Hamirpur
Shuttering & Binding of reinforcement for U/S Flank wall, 4th lift at Block No-1 is under progress.
56/100
Instream Storage Structure, Khalpal
Slump testing M20A20 (Value 85 mm) of Barrage Bay No-2 Gravity floor done in presence of Client & PSS Team.
57/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Barrage Bay No-2 Gravity floor is under progress in presence of Client & PSS Team.
58/100
Instream Storage Structure, Khalpal
Shuttering of RHS Double Pier No-25, 3rd lift is under progress.
59/100
Instream Storage Structure, Khalpal
Shuttering of LHS D/S Divide wall, 2nd lift is under progress.
60/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
61/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 85 mm) of Pier No-1, 13th lift done in presence of Client & PSS Team.
62/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of Pier No-1, 13th lift is under progress in presence of Client & PSS Team.
63/100
Instream Storage Structure, Hamirpur
Barrage Bay Gate installation and hoist Bridge platform installation work in presence of Client & PSS team.
64/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 21.78/mm2 for 07 days) of Pier No-4, 4th lift and (Strength is 31.04/mm2 for 28 days) of U/S Flared out wall Raft at Block No-1 and (Strength is 21.48/mm2 for 07 days) of U/S Abutment (A1) and M30A20 (Strength is 37.93/mm2 for 28 days) of Groove 2nd stage, 5th lift (Bay No-9) has done in presence of Client & PSS team.
65/100
Instream Storage Structure, Hamirpur
Observed of Sieve analysis of Coarse aggregate (10mm & 20mm) and Fine aggregate in presence of Client & PSS team along with EPC agency.
66/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-3, 12th lift is under progress.
67/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Gantry Girder is under progress.
68/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-2, 13th lift is under progress.
69/100
Instream Storage Structure, Hamirpur
Shuttering of D/S Abutment (A1), 11th lift at Block No-1 is under progress.
70/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for U/S Flank wall, 4th lift at Block No-1 is under progress.
71/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Slump testing M25A20 (Value 90 mm) of LHS Divide wall Glacis portion done in presence of Client & PSS Team.
72/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Concreting M25A20 of LHS Divide wall Glacis portion is under progress in presence of Client & PSS Team.
73/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
RHS Deck slab Girder placing work in progress.
74/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Slump testing M25A20 (Value 80 mm) of LHS U/S Divide wall, 3rd lift done in presence of Client & PSS Team.
75/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Concreting M25A20 of LHS U/S Divide wall, 3rd lift is under progress in presence of Client & PSS Team.
76/100
Instream Storage Structure, Khalpal
Slump testing M20A20 (Value 90 mm) of Barrage Bay No-2 Gravity floor done in presence of Client & PSS Team.
77/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Barrage Bay No-2 Gravity floor is under progress in presence of Client & PSS Team.
78/100
Instream Storage Structure, Khalpal
Slump testing M25A20 (Value 90 mm) of Pier No-15 (Starter) done in presence of Client & PSS Team.
79/100
Instream Storage Structure, Khalpal
Concreting M25A20 of Pier No-15 (Starter) is under progress in presence of Client & PSS Team.
80/100
Instream Storage Structure, Khalpal
Shuttering of RHS Pier No-25, 3rd lift is under progress.
81/100
Instream Storage Structure, Khalpal
Testing of Compressive M20A20 (Strength is 29.93/mm2 for 28 days) of Barrage Bay No-3 Gravity floor has done in presence of Client & PSS team.
82/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
83/100
UGPL, Right Lower Suktel Canal Division
Excavation work is in progress for Laying of 280mm Dia HDPE pipe Junction in between J 8083 to J 8043 at village Charbahali in presence of PMC team and EPC Officials.
84/100
Instream Storage Structure, Gudvella
Today the Revenue Inspector and Amin of Jamut under Tusura Tahsil, Balangir District visited ISS Gudvella for the demarcation of the A2-side approach road. The demarcation was carried out in the presence of the Department JE, PMC Site Engineer, Agency Site Engineer and local villagers on 25.06.2026
85/100
Instream Storage Structure, Gudvella
Today the Revenue Inspector and Amin of Jamut under Tusura Tahsil, Balangir District visited ISS Gudvella for the demarcation of the A2-side approach road. The demarcation was carried out in the presence of the Department JE, PMC Site Engineer, Agency Site Engineer and local villagers on 25.06.2026
86/100
Instream Storage Structure, Gudvella
Plastering work is in progress at 1st floor building on 25.06.2026
87/100
Instream Storage Structure, Gudvella
Grinding work of the Stoplog Gate is in progress on 25.06.2026
88/100
Instream Storage Structure, Gudvella
The fitting of the rope drum cover is in progress on 25.06.2026
89/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 25.06.2026
90/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 25.06.2026
91/100
Instream Storage Structure, Nandagaon
M35 A20 grade casting 2nd stage concrete at pier no. 10,11,12 & 13 on dated 28/05/26 & testing on dated 25/06/26 (28day) in presence of above technical person the ave valve of cube strength is 44.89N/mm2 on 25.06.2026
92/100
Instream Storage Structure, Nandagaon
M25 A20 grade concrete casting of control room basement slab in presence of SDO ISS Nandagaon & QC exp. Sr site engineering, site engineering of Pmc & site engineering of EPC agency. The slump value checked at casting is 85mm on 25.06.2026
93/100
Instream Storage Structure, Nandagaon
M25 A20 grade concrete casting of control room basement slab in presence of SDO ISS Nandagaon & QC exp. Sr site engineering, site engineering of Pmc & site engineering of EPC agency. The slump value checked at casting is 85mm on 25.06.2026
94/100
Instream Storage Structure, Nandagaon
• Site visit of ISS Nandagaon by QAC, Expert, SHEE, Sr. Site Engineer of PMC and SDO ISS ,Nandagaon today on dt. 25.06. 2026 in presence of all site Engineers of PMC and EPC Agency and PM of EPC Agency. The following activities are in progress: 1.The area of placing concrete for basment slab of office building have been checked before placement in presence of PM of EPC Agency, Site Engineers of PMC & EPC Agency as follows: (i).The reinforcement in binding,placing and tying of basment slab of office building monolithic with 2-legged stirrups of plinth beam are found completed. (ii).Rigid & smooth shuttering and maintained clear cover of 20mm from main bar to shutter plates for basment slab are done. (iii).The area is cleaned and passed by SE, KID, Bhawanipatna for placing with RCC M25A20 grade on 25.06.2026
95/100
Instream Storage Structure, Nandagaon
The erection work has been stopped at the site today due to labour issues on 25.06.2026
96/100
Instream Storage Structure, Nandagaon
River flow are passing through both undersluice bays area on 25.06.2026
97/100
Instream Storage Structure, Nandagaon
Reinforcement binding & shuttering is in progress at D/S right flank wall on 25.06.2026
98/100
UGPL, Right Lower Suktel Canal Division
Approach channel bed level mud cleaning work is in progress at Pump House.
99/100
UGPL, Left Lower Suktel Canal Division
Excavation work is in progress of 160mm Dia HDPE pipeline between J-338 to LO-131, LM-6 near village Bianrpali in presence of PMC team.
100/100
Instream Storage Structure, Hamirpur
Curing of Flank wall at Block No-1 is under progress.