1/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 7.40m.
2/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 6.10m.
3/100
Integrated Barrage across river Kochila and across river Baitarini
C.E.,Designs,CE MBBS,Chandikhole,S.E.,AEE,AE of Akhuapada Irrigation Division,PMC team visited Baitarani ISS.
4/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 6.10m
5/100
Integrated Barrage across river Kochila and across river Baitarini
CC Block casting work at Baitarani ISS is in progress.
6/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 6.30m.
7/100
Integrated Barrage across river Kochila and across river Baitarini
CC Block casting work at Baitarani ISS is in progress.
8/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 6.10m.
9/100
Integrated Barrage across river Kochila and across river Baitarini
Girder casting work of Baitarani ISS is in progress.
10/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 6.40m.
11/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 6.40m.
12/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 8.50m.
13/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 10.30m.
14/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 10.30m.
15/100
Integrated Barrage across river Kochila and across river Baitarini
Checking of Reinforcement and shuttering work for pre cast Bridge Girder of Baitarani ISS before its concreting by S.S. & AEE,QAD,Chandikhole AEE Dhamnagar Irr Sub Division and PMC Team
16/100
Integrated Barrage across river Kochila and across river Baitarini
Checking of Reinforcement and shuttering work for pre cast Bridge Girder of Baitarani ISS before its concreting by S.S. & AEE,QAD,Chandikhole AEE Dhamnagar Irr Sub Division and PMC Team
17/100
Integrated Barrage across river Kochila and across river Baitarini
Girder Casting work at Baitarani ISS is in progress.
18/100
Integrated Barrage across river Kochila and across river Baitarini
Girder Shuttering work at Baitarani ISS is in progress.
19/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 10.10m
20/100
Integrated Barrage across river Kochila and across river Baitarini
C.C. Block casting work at Baitarani ISS is in progress.
21/100
Instream Storage Structure, Gudvella
• Visited employee and labours of TATA power at ISS Gudvella site
To energized / charging of transformer is under progress at site on 09.09.2026
22/100
Instream Storage Structure, Khalpal
Curing of Girders is under progress.
23/100
Instream Storage Structure, Khalpal
Present flow condition of river at Khalpal site level RL 56.82m.
24/100
Instream Storage Structure, Hamirpur
Slump testing M15A40 (Value 45 mm) of U/S (A2) Flared out wall, 14th lift at Block No-5 done in presence of Client & PSS Team.
25/100
Instream Storage Structure, Hamirpur
Concreting M15A40 of U/S (A2) Flared out wall, 14th lift at Block No-5 is under progress in presence of Client & PSS Team.
26/100
Instream Storage Structure, Hamirpur
Column guide line fixing and welding work is in progress.
27/100
Instream Storage Structure, Hamirpur
Bottom block rope pulley bracket welding work is in progress.
28/100
Instream Storage Structure, Hamirpur
Reinforcement binding for Deck slab (Bay No-18) is under progress.
29/100
Instream Storage Structure, Hamirpur
Mud cleaning from Watchman Quater footing Area is under progress.
30/100
Instream Storage Structure, Hamirpur
Shuttering of D/S Flank wall, 10th lift at Block No-5 is under progress.
31/100
Instream Storage Structure, Hamirpur
Present flow condition of river at Hamirpur site water level RL 179.600m.
32/100
Instream Storage Structure, Gudvella
D/S view of ISS Gudvella on 08.09.2026
33/100
Instream Storage Structure, Gudvella
U/S view of ISS Gudvella on 08.09.2026
34/100
Instream Storage Structure, Khalpal
Curing of Girders is under progress.
35/100
Instream Storage Structure, Khalpal
Present flow condition of river at Khalpal site level RL 56.747m.
36/100
Instream Storage Structure, Khalpal
Testing of Compressive M35A20 (Strength is 41.64/mm2 for 28 days) of Girder No-57 has done in presence of Client & PSS team.
37/100
Instream Storage Structure, Khalpal
Curing of Girders is under progress.
38/100
Instream Storage Structure, Khalpal
Present flow condition of river at Khalpal site level RL 56.73m.
39/100
Instream Storage Structure, Nandagaon
Curing is in progress at approach slab on 08.09.2026
40/100
Instream Storage Structure, Hamirpur
Testing of Compressive M35A20 (Strength is 42.07/mm2 for 28 days) of Gantry Girder No-58 and M35A20 (Strength is 42.44/mm2 for 28 days) of Fish pass slab at Block No-5 and M15A40 (Strength is 13.33/mm2 for 07 days) of U/S Flared out wall, 13th lift at Block No-5 has done in presence of Client & PSS team.
41/100
Instream Storage Structure, Hamirpur
Rope drum hoist lifting arrangements bottom block rope pulley bracket welding work is in progress.
42/100
Instream Storage Structure, Hamirpur
Mud cleaning from Watchman Quater footing Area is under progress.
43/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for D/S Flank wall, 10th lift at Block No-5 is under progress.
44/100
Instream Storage Structure, Hamirpur
Present flow condition of river at Hamirpur site water level RL 179.650m.
45/100
Instream Storage Structure, Hamirpur
Testing of Compressive M35A20 (Strength is 42.30/mm2 for 28 days) of Gantry Girder No-57 has done in presence of Client & PSS team.
46/100
Instream Storage Structure, Hamirpur
MS plate marking and cutting for single pier column guide line stiffener work is in progress.
47/100
Instream Storage Structure, Hamirpur
Single pier column guide line fixing work is in progress.
48/100
Instream Storage Structure, Hamirpur
Rope drum hoist lifting arrangements bottom block rope pulley bracket work is in progress.
49/100
Instream Storage Structure, Hamirpur
Dewatering from Watchman Quater footing Area is under progress.
50/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for D/S Flank wall, 10th lift at Block No-5 is under progress.
51/100
Instream Storage Structure, Hamirpur
Present flow condition of river at Hamirpur site water level RL 179.780m.
52/100
Instream Storage Structure, Hamirpur
Present flow condition of river at Hamirpur site water level RL 179.980m.
53/100
Instream Storage Structure, Gudvella
D/S view of ISS Gudvella on 07.09.2026
54/100
Instream Storage Structure, Gudvella
U/S view of ISS Gudvella on 07.09.2026
55/100
Instream Storage Structure, Nandagaon
Curing is in progress at approach slab on 07.09.2026
56/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water Level 9.20m
57/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water Level 8.30m
58/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water Level 8.30m
59/100
Integrated Barrage across river Kochila and across river Baitarini
C.C. Block shuttering and Curing work at Baitarani ISS is in progress
60/100
Integrated Barrage across river Kochila and across river Baitarini
CC block casting work at Baitarani ISS is in progress
61/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level is 7.60m
62/100
Integrated Barrage across river Kochila and across river Baitarini
C.C. Block casting work at Baitarani ISS is in progress.
63/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level 10.60m
64/100
Integrated Barrage across river Kochila and across river Baitarini
ISMB placing for precast Girder Platform.
65/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water Level 7.10m
66/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water Level 7.90m
67/100
Instream Storage Structure, KansariGanda
Team (AEE, Site Engineer & team, Amin, PMC-SD expert, Sarpanch-led land losers) carried out joint re-demarcation of 19 private + 28 govt. plots over 1.5 km stretch under UDS Pur.
A . Bond width fixed at 18m, considering cultivable private land
B .Boundary pegs with red flags fixed in presence of villagers
C .Cremation ground exempted from acquisition; bond width maintained as per alignment
Demarcation done with mutual consent of stakeholders.
68/100
Instream Storage Structure, KansariGanda
Team (AEE, Site Engineer & team, Amin, PMC-SD expert, Sarpanch-led land losers) carried out joint re-demarcation of 19 private + 28 govt. plots over 1.5 km stretch under UDS Pur.
A . Bond width fixed at 18m, considering cultivable private land
B .Boundary pegs with red flags fixed in presence of villagers
C .Cremation ground exempted from acquisition; bond width maintained as per alignment
Demarcation done with mutual consent of stakeholders.
69/100
Instream Storage Structure, KansariGanda
Team (AEE, Site Engineer & team, Amin, PMC-SD expert, Sarpanch-led land losers) carried out joint re-demarcation of 19 private + 28 govt. plots over 1.5 km stretch under UDS Pur.
A . Bond width fixed at 18m, considering cultivable private land
B .Boundary pegs with red flags fixed in presence of villagers
C .Cremation ground exempted from acquisition; bond width maintained as per alignment
Demarcation done with mutual consent of stakeholders.
70/100
Instream Storage Structure, KansariGanda
Team (AEE, Site Engineer & team, Amin, PMC-SD expert, Sarpanch-led land losers) carried out joint re-demarcation of 19 private + 28 govt. plots over 1.5 km stretch under UDS Pur.
A . Bond width fixed at 18m, considering cultivable private land
B .Boundary pegs with red flags fixed in presence of villagers
C .Cremation ground exempted from acquisition; bond width maintained as per alignment
Demarcation done with mutual consent of stakeholders.
71/100
Integrated Barrage across river Kochila and across river Baitarini
Baitarani ISS water level 7.70m
72/100
Instream Storage Structure, KansariGanda
Visit of SD Expert of PMC and RI, Malada, and the Sarpanch of UDS Pur along with the Agency team. During the discussion, it was mutually decided to commence the re-demarcation work.
The Sarapancha assured that all land losers are well informed.The Agency team will arrange the required materials, including pegs, crowbars, and hammers, for marking and fixing the demarcated area. The RI Malada will oversee and coordinate the overall re-demarcation work.
73/100
Instream Storage Structure, KansariGanda
Visit of SD Expert of PMC and RI, Malada, and the Sarpanch of UDS Pur along with the Agency team. During the discussion, it was mutually decided to commence the re-demarcation work.
The Sarapancha assured that all land losers are well informed.The Agency team will arrange the required materials, including pegs, crowbars, and hammers, for marking and fixing the demarcated area. The RI Malada will oversee and coordinate the overall re-demarcation work.
74/100
Instream Storage Structure, Hamirpur
Present flow condition of river at Hamirpur site water level RL 179.980m.
75/100
Instream Storage Structure, Hamirpur
Slump testing M15A40 (Value 45 mm) of U/S (A2) Flared out wall, 14th lift at Block No-5 done in presence of Client & PSS Team.
76/100
Instream Storage Structure, Hamirpur
Concreting M15A40 of U/S (A2) Flared out wall, 14th lift at Block No-5 is under progress in presence of Client & PSS Team.
77/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 90 mm) of D/S (A2) Flank wall, 9th lift at Block No-5 done in presence of Client & PSS Team.
78/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of D/S (A2) Flank wall, 9th lift at Block No-5 is under progress in presence of Client & PSS Team.
79/100
Instream Storage Structure, Hamirpur
Testing of Compressive M35A20 (Strength is 42.44/mm2 for 28 days) of Gantry Girder No-56 and M25A20 (Strength is 31.02/mm2 for 28 days) of U/S Flank wall, 12th lift at Block No-5 has done in presence of Client & PSS team.
80/100
Instream Storage Structure, Hamirpur
Present flow condition of river at Hamirpur site water level RL 180.140m.
81/100
Instream Storage Structure, Khalpal
Curing of Girders is under progress.
82/100
Instream Storage Structure, Khalpal
Present flow condition of river at Khalpal site level RL 58.01m.
83/100
Instream Storage Structure, Gudvella
D/S side view of ISS Gudvella on 05.09.2026
84/100
Instream Storage Structure, Gudvella
U/S side view of ISS Gudvella on 05.09.2026
85/100
Instream Storage Structure, Nandagaon
Curing is in progress at approach slab on 06.09.2026
86/100
Instream Storage Structure, Nandagaon
No mechanical work today at the site due to labour issues on 05.09.2026
87/100
Instream Storage Structure, Nandagaon
Curing is in progress at office building on 05.09.2026
88/100
Instream Storage Structure, Nandagaon
Reinforcement binding & Shuttering for kerb at left side approach slab is in progress on 05.09.2026
89/100
Instream Storage Structure, Gudvella
U/S side view of ISS Gudvella on 04.09.2026
90/100
Instream Storage Structure, Gudvella
• Today Irrigation Engineer Expert visited the site. Site in-charge of the agency and site engineer, PMC are present.
Observations:-
The rubber seal installation works are yet to be completed in 2 Nos. out of the total 10 Nos. Further, the power transformer has not yet been charged/energized. It is charged from DG set.
The agency shall accord priority to completion of the balance rubber seal installation works and charging/energization of the transformer from TATA Power ,so as to facilitate commencement of the wet test at the earliest and avoid further delay in the testing on 03.09.2026
91/100
Instream Storage Structure, Gudvella
D/S side view of ISS Gudvella on 03.09.2026
92/100
Instream Storage Structure, Gudvella
U/S side view of ISS Gudvella on 03.09.2026
93/100
Instream Storage Structure, Gudvella
D/S side view of ISS Gudvella on 02.09.2026
94/100
Instream Storage Structure, Gudvella
U/S side view of ISS Gudvella on 02.09.2026
95/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M35A20 grade at left side approach slab is in progress in presence of PM EPC agency,Site Engineers of PMC. The slump test value is 85mm on 04.09.2026
96/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M35A20 grade at left side approach slab is in progress in presence of PM EPC agency,Site Engineers of PMC. The slump test value is 85mm on 04.09.2026
97/100
Instream Storage Structure, Nandagaon
Laying & placing and binding & tying of bottom main & distribution bars of left side approach slab is in progress on 04.09.2026
98/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M35A20 grade of 8nos. post at right side approach slab is in progress in presence of PM EPC agency, Site Engineers of PMC. The slump test value is 84mm on 03.09.2026
99/100
Instream Storage Structure, Nandagaon
Concrete casting with RCC M35A20 grade of 8nos. post at right side approach slab is in progress in presence of PM EPC agency, Site Engineers of PMC. The slump test value is 84mm on 03.09.2026
100/100
Instream Storage Structure, Nandagaon
Fixing of precast railing is in progress at right side approach slab on 03.09.2026
❮
❯