PMIS for ISS/MMIPs/UGPL Projects

Total No of Schemes – 53 nos ( ISS-46, MMIPs-6, UGPL-1 )
1/100
Instream Storage Structure, Gudvella
The DCAC meeting for the Right Side Land Acquisition was successfully held under the chairmanship of the Collector Sir Sir. The meeting was attended by the ADM Revenue, LAO Balangir, Tahsildar Tusura, Horticulture Officer, Forest Officers, SE, SDO, AE and JE of the Irrigation Department. All concerned officials participated in the discussion regarding the land acquisition process on 09.06.2026
2/100
Instream Storage Structure, Gudvella
Plastering work is under progress at control room building on 09.06.2026
3/100
Instream Storage Structure, Gudvella
Stone packing under progress at d/s side on 09.06.2026
4/100
Instream Storage Structure, Gudvella
Mechanical work under progress at site on 09.06.2026
5/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 09.06.2026
6/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 09.06.2026
7/100
Instream Storage Structure, Nandagaon
Shuttering for 2nd stage concrete is in progress at pier no. 11, 12 & 13 on 09.06.2026
8/100
Instream Storage Structure, Nandagaon
Shuttering for plinth beam of office building is in progress on 09.06.2026
9/100
Instream Storage Structure, Hamirpur
Slump testing M35A20 (Value 90 mm) of Gantry Girder No-34 done in presence of Client & PSS Team.
10/100
Instream Storage Structure, Hamirpur
Concreting M35A20 of Gantry Girder No-34 is under progress in presence of Client & PSS Team.
11/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 85 mm) of D/S Flank Cut-off wall, 2nd lift (River side) at Block No-1 done in presence of Client & PSS Team.
12/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of D/S Flank Cut-off wall, 2nd lift (River side) at Block No-1 is under progress in presence of Client & PSS Team.
13/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 80 mm) of Pier No-3, 10th lift done in presence of Client & PSS Team.
14/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of Pier No-3, 10th lift is under progress in presence of Client & PSS Team.
15/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 21.33/mm2 for 07 days) of Pier No-3, 9th lift and (Strength is 21.63/mm2 for 07 days) of U/S Flared out wall Raft at Block No-1 and M15A40 (Strength is 20.65/mm2 for 28 days) of D/S Flared out wall (PCC) at Block No-5 and M30A20 (Strength is 27.85/mm2 for 07 days) of Groove 2nd stage, 3rd lift (Bay No-28) has done in presence of Client & PSS team.
16/100
Instream Storage Structure, Hamirpur
Drive unit assembly fit-up work is in progress.
17/100
Instream Storage Structure, Hamirpur
U/S hoist bridge platform assembly No-8 welding work is in progress.
18/100
Instream Storage Structure, Hamirpur
Shuttering & Binding of reinforcement for D/S Abutment (A1), 10th lift at Block No-1 is under progress.
19/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-2, 9th lift is under progress.
20/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-1, 10th lift is under progress.
21/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Slump testing M25A20 (Value 90 mm) of LHS D/S Abutment Counterfort glacis portion done in presence of Client & PSS Team.
22/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Concreting M15A40 of LHS Divide wall Raft (PCC) is under progress in presence of Client & PSS Team.
23/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Shuttering of RHS D/S Counterfort & Wing wall, 2nd lift and De-Shuttering of RHS D/S Counterfort & Wing wall, 1st lift is under progress.
24/100
Instream Storage Structure, Jharbeda
Concreting M20A20 of RHS D/S Training wall, 2nd lift is under progress in presence of Client & PSS Team.
25/100
Instream Storage Structure, Khalpal
Slump testing M20A20 (Value 80 mm) of Barrage Bay No-2 Gravity floor done in presence of Client & PSS Team.
26/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Barrage Bay No-2 Gravity floor is under progress in presence of Client & PSS Team.
27/100
Instream Storage Structure, Khalpal
Shuttering of LHS U/S divide wall, 3rd lift is in progress.
28/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
29/100
UGPL, Left Lower Suktel Canal Division
OMS chamber fixing work is in progress at LO-7A, LM-1 near village Kusmel in presence of PMC team and EPC Agency.
30/100
UGPL, Left Lower Suktel Canal Division
Excavation work is in progress for DI to HDPE connection at J-388, RM-2, near village Kushmel.
31/100
UGPL, Right Lower Suktel Canal Division
Excavation work is in progrress for 1HA outlet subchak installation of OCS no-0201207-C01A at-Chubandh
32/100
Instream Storage Structure, Gudvella
• HM Expert visited ISS Gudvella. During the visit, the Department JE, PMC site engineers and agency engineers were present. 1. The mechanical work was inspected and the operation of three gates was tested. 2. Rubber seal fixing work is in progress. 3. The agency was instructed to complete the erection of the stoplog gates and staircase at the earliest on 08.06.2026
33/100
Instream Storage Structure, Gudvella
Mechanical and electrical work is under progress at site on 08.06.2026
34/100
Instream Storage Structure, Gudvella
Stone pitching work is under progress at site on 08.06.2026
35/100
Instream Storage Structure, Gudvella
Plastering work at building area is under progress at site on 08.06.2026
36/100
UGPL, Left Lower Suktel Canal Division
HDD machine road pushing work is in progress (road crossing) of 75mm Dia HDPE pipe between LO-230A(Z-2471) LM-12 near village Kandajhuri in presence of PMC team.
37/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 08.06.2026
38/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 08.06.2026
39/100
UGPL, Left Lower Suktel Canal Division
Butt fusion joint work is in progress of 140mm Dia HDPE node from J-560 to LO-228, LM-12 near village Kandajuri in presence of PMC team.
40/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M25A20 grade for wearing coat at bay no.-3 is in progress in presence of SDO, ISS Nandgaon, QAC,Expert of PMC,PM EPC agency, Site Engineer's of PMC & EPC agency. The slump test value is 85mm on 08.06.2026
41/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M25A20 grade for wearing coat at bay no.-3 is in progress in presence of SDO, ISS Nandgaon, QAC,Expert of PMC,PM EPC agency, Site Engineer's of PMC & EPC agency. The slump test value is 85mm on 08.06.2026
42/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade of 2nd stage concrete at pier no.13&A2 of bay-14 is in progress in presence of PM EPC agency, Site Engineers of PMC & EPC agency. The slump test value is 85mm on 08.06.2026
43/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade of 2nd stage concrete at pier no.13&A2 of bay-14 is in progress in presence of PM EPC agency, Site Engineers of PMC & EPC agency. The slump test value is 85mm on 08.06.2026
44/100
Instream Storage Structure, Nandagaon
2.(i) Cleaning of all deposited silt,sand and debris from crest,glacis and stilling basin area of bay -3 at barrage bay-1 is completed in presence of PM EPC agency, Site Engineer's of PMC & EPC agency. (ii) The area is cleaned through air water jetting and passed by SE, Kid, Bhawanipatna for placing wearing coat concrete with PCC M25A20 grade on 08.06.2026
45/100
Instream Storage Structure, Nandagaon
1.Fixing & fittings and alignment of 2nd. stage embedded parts and numbers of dowel bars provided as per approved drawing at roller tracks of both stoplog & service gate grooves at bay no.14 of pier no.13 & A2 for 2nd lift at stoplog gate & 1st lift at main gate grooves have been checked and found correct by HM Expert of PMC during his site visit on dt.01.06.2026 in presence of all civil n mechanical Site Engineers of PMC and EPC Agency as per the approved Mechanical drawing & designs. (i)Accordingly the rigid n smooth shuttering for placing the 2nd. Stage concrete is completed as follows: ii) Chipping of old vertical concrete surface is done.(iii).The area is cleaned on 08.06.2026
46/100
Instream Storage Structure, Nandagaon
Shuttering for 2nd stage concrete is in progress at pier no.11&12 on 08.06.2026
47/100
Instream Storage Structure, Nandagaon
Shuttering is in progress at D/S right flared out wall on 08.06.2026
48/100
Instream Storage Structure, Hamirpur
Concreting M15A40 of Staf quater Building foundation is under progress in presence of Client & PSS Team.
49/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 85 mm) of U/S Flared out wall Raft done in presence of Client & PSS Team.
50/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of U/S Flared out wall Raft is under progress in presence of Client & PSS Team.
51/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 90 mm) of U/S Abutment (A1), 7th lift at Block No-1 done in presence of Client & PSS Team.
52/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of U/S Abutment (A1), 7th lift at Block No-1 is under progress in presence of Client & PSS Team.
53/100
Instream Storage Structure, Hamirpur
Testing of Compressive M25A20 (Strength is 21.33/mm2 for 07 days) of Pier No-1, 9th lift and (Strength is 21.63/mm2 for 07 days) of D/S Flank wall, 1st lift at Block No-5 and (Strength is 30.91/mm2 for 28 days) of D/S Flared out wall Raft at Block No-5 and M15A40 (Strength is 13.48/mm2 for 07 days) of D/S Flared out wall (PCC) at Block No-5 has done in presence of Client & PSS team.
54/100
Instream Storage Structure, Hamirpur
R.D.U No-22 frame welding work is in progress.
55/100
Instream Storage Structure, Hamirpur
U/S hoist bridge platform assembly No-8 welding work is in progress.
56/100
Instream Storage Structure, Hamirpur
Shuttering & Binding of reinforcement for U/S Flared wall Raft is under progress.
57/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for D/S Flared wall Cut-off, 2nd lift is under progress.
58/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Pier No-2, 10th lift is under progress.
59/100
Instream Storage Structure, Hamirpur
Shuttering of Pier No-3, 9th lift is under progress.
60/100
Instream Storage Structure, Hamirpur
Binding of reinforcement for Deck slab (Bay No-11) is under progress.
61/100
Instream Storage Structure, Hamirpur
Shuttering & Binding of reinforcement for Abutment (A1), 10th lift at Block No-1 is under progress.
62/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Earth excavation of LHS divide wall raft is under progress.
63/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
De-Shuttering of Divide wall, 8th lift is under progress.
64/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE SANTEIBHANJA
Curing of work is under progress.
65/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Shuttering & Binding of reinforcement for RHS Counterfort & Abutment wall, 3rd lift is under progress.
66/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Shuttering of RHS D/S Counterfort & Wing wall, 2nd lift and De-Shuttering of RHS D/S Counterfort & Wing wall, 1st lift is under progress.
67/100
Instream Storage Structure, Jharbeda
Cleaning & Dewatering of Pier No-9 area is under progress.
68/100
Instream Storage Structure, Jharbeda
Shuttering of Pier No-8 is under progress.
69/100
Instream Storage Structure, Jharbeda
Shuttering of Pier No-7 is under progress.
70/100
Instream Storage Structure, Jharbeda
Curing of Pier No-7 & (A2) is under progress.
71/100
Instream Storage Structure, Khalpal
Slump testing M25A20 (Value 85 mm) of Barrage Bay No-2 Gravity floor done in presence of Client & PSS Team.
72/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Barrage Bay No-2 Gravity floor is under progress in presence of Client & PSS Team.
73/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
74/100
Instream Storage Structure, Gudvella
Stone pitching work at u/s side of A1 on 07.06.2026
75/100
Instream Storage Structure, Gudvella
Plastering work is in progress on 07.06.2026
76/100
Instream Storage Structure, Gudvella
Mechanical work is in progress on 07.06.2026
77/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 07.06.2026
78/100
INSTREAM STORAGE STRUCTURE ACROSS RIVER SAMAKOI NEAR VILLAGE TELKOI
Slump testing M20A20 (Value 80 mm) of RHS Gravity floor done in presence of Client & PSS Team.
79/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 07.06.2026
80/100
Instream Storage Structure, Hamirpur
Slump testing M35A20 (Value 90 mm) of Gantry Girder No-33 done in presence of Client & PSS Team.
81/100
Instream Storage Structure, Hamirpur
Concreting M35A20 of Gantry Girder No-33 is under progress in presence of Client & PSS Team.
82/100
Instream Storage Structure, Khalpal
Slump testing M20A20 (Value 80 mm) of Barrage Bay No-2 Gravity floor done in presence of Client & PSS Team.
83/100
Instream Storage Structure, Gudvella
• Visited SDO, AE at ISS Gudvella site. Department JE, Site engineers of PMC n agency were present 1. Checked all of the progress of the site. 2. Instructed to agency to complete the stone pitching work, gate work and building work before 15 June 2026 on 06.06.2026
84/100
Instream Storage Structure, Khalpal
Concreting M20A20 of Barrage Bay No-2 Gravity floor is under progress in presence of Client & PSS Team.
85/100
Instream Storage Structure, Khalpal
Slump testing M25A20 (Value 80 mm) of RHS Double Pier No-25, 1st lift done in presence of Client & PSS Team.
86/100
Instream Storage Structure, Gudvella
Railing work is under progress at host bridge on 06.06.2026
87/100
Instream Storage Structure, Khalpal
Concreting M25A20 of RHS Double Pier No-25, 1st lift is under progress in presence of Client & PSS Team.
88/100
Instream Storage Structure, Gudvella
Plastering work is under progress at building area at site on 06.06.2026
89/100
Instream Storage Structure, Khalpal
Testing of Compressive M25A20 (Strength is 34.46/mm2 for 28 days) of LHS D/S Divide wall Raft has done in presence of Client & PSS team.
90/100
Instream Storage Structure, Gudvella
Arrangement of rope wire at gates are under progress at site on 06.06.2026
91/100
Instream Storage Structure, Khalpal
Shuttering of LHS U/S Divide wall, 3rd lift is under progress.
92/100
Instream Storage Structure, Gudvella
Stone pitching work at u/s side is under progress at site on 06.06.2026
93/100
Instream Storage Structure, Khalpal
Shuttering of RHS Double Pier No-25, 1st lift is under progress.
94/100
Instream Storage Structure, Khalpal
Curing of Gravity floor, Piers, Divide wall and Barrage Bay No-2 Raft is in progress.
95/100
Instream Storage Structure, Gudvella
D/s side view of ISS Gudvella on 06.06.2026
96/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 80 mm) of Pier No-21, 15th lift done in presence of Client & PSS Team.
97/100
Instream Storage Structure, Gudvella
U/s side view of ISS Gudvella on 06.06.2026
98/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of Pier No-21, 15th lift is under progress in presence of Client & PSS Team.
99/100
Instream Storage Structure, Hamirpur
Slump testing M25A20 (Value 85 mm) of Pier No-2, 8th lift done in presence of Client & PSS Team.
100/100
Instream Storage Structure, Hamirpur
Concreting M25A20 of Pier No-2, 8th lift is under progress in presence of Client & PSS Team.