1/100
Instream Storage Structure across river Sapei near village Kinjirma
Site view of d/s side .
2/100
Instream Storage Structure across river Sapei near village Kinjirma
Site view of u/s side .
3/100
Instream Storage Structure Across Bheden near village Saida
2nd stage gate grove curing work is going on .
4/100
Instream Storage Structure Across Bheden near village Saida
RHS D/S Flared out wall excavation work is in progress .
5/100
Instream Storage Structure Across Bheden near village Saida
RHS D/S Flank wall 4th lift de-shuttering work is going on .
6/100
Instream Storage Structure Across Bheden near village Saida
P-4 to P-5 between mid portion Deck slab de-shuttering work is going on .
7/100
Instream Storage Structure, Gochara
Staff quarter stair case shuttering work on progress .
8/100
Instream Storage Structure, Budharaja
Curing Work is in Progress.
9/100
Instream Storage Structure, Budharaja
De-Shuttering in 18th step & Shuttering Work is in Progress at RHS D/S Flared-Out Wall, 19th Step. RL: 216.500 to 217.100.
10/100
Instream Storage Structure, Khirasasan
RHS ABUTMENT HOIST PORTION SHUTTERING WORK UNDER PROGRESS
11/100
Instream Storage Structure, Khirasasan
RHS divide wall hoist portion shuttering work under progress
12/100
Instream Storage Structure, Khirasasan
RHS C F WING WALL 11 TH LIFT SHUTTRING WORK UNDER PROGRESS
13/100
Instream Storage Structure, Khirasasan
LHS U/S FLARED OUT WALL 16 TH LIFT SHUTTERING WORK UNDER PROGRESS
14/100
Instream Storage Structure, Kudabega
Slump 80mm
15/100
Instream Storage Structure, Kudabega
Slump 80mm
16/100
Instream Storage Structure, Kudabega
Slump 85mm
17/100
Instream Storage Structure, Kudabega
Span no-01 U/S Handrail beam fixing with Post shuttering work in progress.
18/100
Instream Storage Structure, Kudabega
U/S side sluice bay stone filling for CC block fixing work in progress
19/100
Instream Storage Structure, Kudabega
Stone braking work in progress
20/100
Instream Storage Structure, Kudabega
ISS Kudabaga - Trestle's or Column's Installation work is in progress
21/100
Instream Storage Structure, Kudabega
Span no-07 gate groove shuttering work in progress
22/100
Instream Storage Structure, Kudabega
CC block fixing work in progress
23/100
Instream Storage Structure, Kudabega
ISS Kudabaga - Hoist bridge's 31th & 32th platforms assembly work is in progress
24/100
Instream Storage Structure, Kudabega
ISS Kudabaga - Monorail girder's joints work is in progress
25/100
Barrage across river Turi & Guntat
Compressive strength test of concrete cubes of grade M20A20 conducted at Field Laboratory of Turi Barrage Site.
26/100
Instream Storage Structure, Kopsinga
Slump-85mm flared wall
27/100
Instream Storage Structure, Kopsinga
Fish pass solid slab concrete casting complete
28/100
Instream Storage Structure, Kopsinga
Fish pass solid slab casting under progress in presence of Dept JE madam
29/100
Instream Storage Structure, Kopsinga
Slump-95mm
30/100
Instream Storage Structure, Kopsinga
Cube test
31/100
Instream Storage Structure, Gudvella
Casting of concrete at A2 u/s flared out wall of grade M20A20 8th lift PCC from RL 152.80 m to 153.40 m section 2-2 to 4-4 M15A40 grade is completed in the presence of Dept JE, site engineers of PMC n agency foreman. The slump test value is 75mm on 27.01.2026
32/100
Instream Storage Structure, Gudvella
Casting of concrete at A2 u/s flared out wall of grade M20A20 8th lift PCC from RL 152.80 m to 153.40 m section 2-2 to 4-4 M15A40 grade is completed in the presence of Dept JE, site engineers of PMC n agency foreman. The slump test value is 75mm on 27.01.2026
33/100
Instream Storage Structure, Gudvella
Casting of concrete at right side u/s flared out wall from sec 1-1 to 2-2 from RL 154.00m to 154.60m for 10th lift PCC M15A40 grade is under progress through chute in the presence of Dept JE, site engineers of PMC n agency foreman. The slump test value is 72mm on 27.01.2026
34/100
Instream Storage Structure, Gudvella
Casting of concrete at right side u/s flared out wall from sec 1-1 to 2-2 from RL 154.00m to 154.60m for 10th lift PCC M15A40 grade is under progress through chute in the presence of Dept JE, site engineers of PMC n agency foreman. The slump test value is 72mm on 27.01.2026
35/100
Instream Storage Structure, Gudvella
Cast of concrete 9th lift PCC M20A20 grade at right side D/s flared out wall from sec 2-2 to 4-4 with RL 153.40m to 154.00m is under progress in the presence of Dept JE, site engineers of PMC n agency foreman. The slump test value is 69mm on 27.01.2026
36/100
Instream Storage Structure, Gudvella
Cast of concrete 9th lift PCC M20A20 grade at right side D/s flared out wall from sec 2-2 to 4-4 with RL 153.40m to 154.00m is under progress in the presence of Dept JE, site engineers of PMC n agency foreman. The slump test value is 69mm on 27.01.2026
37/100
Instream Storage Structure, Gudvella
Cast of concrete 7th lift RCC M25A20 grade at right side u/s flank wall including return wall from RL 156.25m to 157.50m is under progress through pump in the presence of Dept JE, site engineers of PMC n agency. The slump test value is 85mm on 27.01.2026
38/100
Instream Storage Structure, Gudvella
Cast of concrete 7th lift RCC M25A20 grade at right side u/s flank wall including return wall from RL 156.25m to 157.50m is under progress through pump in the presence of Dept JE, site engineers of PMC n agency. The slump test value is 85mm on 27.01.2026
39/100
Instream Storage Structure, Gudvella
• Visited ISS Gudvella site along with IE expert .Site engineers of PMC n agency were present.
1. Conducted test for 28 days compressive strength of concrete cube RCC M25 A20 at field laboratory and result found 34.36 N/mm2
2. Conducted test for 28 days compressive strength of concrete cube PCC M15A40 grade at field laboratory and result found 21.62 N/mm2
3. Conducted 28 days compressive strength of concrete cube PCC M20A20 grade at field laboratory and result found 23.84 N/mm2
4. Test for 7 days compressive strength of concrete cube RCC M25 A20 grade conducted and result found 23.36 N/mm2
5. Test for 7 days compressive strength of concrete cube PCC M20 A20 grade conducted and result found 17.62 N/mm2
6. Test for 7 days compressive strength of concrete cube PCC M15 A40 grade conducted and result found 15.77 N/mm2 on 27.01.2026
40/100
Instream Storage Structure, Gudvella
• Visited ISS Gudvella site along with IE expert .Site engineers of PMC n agency were present.
1. Conducted test for 28 days compressive strength of concrete cube RCC M25 A20 at field laboratory and result found 34.36 N/mm2
2. Conducted test for 28 days compressive strength of concrete cube PCC M15A40 grade at field laboratory and result found 21.62 N/mm2
3. Conducted 28 days compressive strength of concrete cube PCC M20A20 grade at field laboratory and result found 23.84 N/mm2
4. Test for 7 days compressive strength of concrete cube RCC M25 A20 grade conducted and result found 23.36 N/mm2
5. Test for 7 days compressive strength of concrete cube PCC M20 A20 grade conducted and result found 17.62 N/mm2
6. Test for 7 days compressive strength of concrete cube PCC M15 A40 grade conducted and result found 15.77 N/mm2 on 27.01.2026
41/100
Instream Storage Structure, Gudvella
• Visited the site with QC Expert. All the site engineers are present at the site.
The construction work at Gudvella ISS is progressing with 70 nos of labourer. As on date, concreting of the A2 body wall has been completed up to all lifts except the 2 nos of lift on the right side, which is pending.
Further, in the upstream & downstream (U/S &D/S) flared-out wall, concreting has been completed up to the 9th lift out of 18th lift and the remaining lifts are yet to be taken up.
In the u/s flanked wall 7th lift completed out of 9th lift. In D/s 6th lift completed.
In u/s wing wall 9th /10th completed and d/s 4th/9th completed.
The balance works shall be taken up sequentially after completion of necessary preparations, shuttering, and reinforcement checks.
In the mechanical work, sill beam in 4 span out of 10 span is completed.
After completion of Rt side Abutment, placing of cc block will be started on 27.01.2026
42/100
Instream Storage Structure, Gudvella
• Visited the site with QC Expert. All the site engineers are present at the site.
The construction work at Gudvella ISS is progressing with 70 nos of labourer. As on date, concreting of the A2 body wall has been completed up to all lifts except the 2 nos of lift on the right side, which is pending.
Further, in the upstream & downstream (U/S &D/S) flared-out wall, concreting has been completed up to the 9th lift out of 18th lift and the remaining lifts are yet to be taken up.
In the u/s flanked wall 7th lift completed out of 9th lift. In D/s 6th lift completed.
In u/s wing wall 9th /10th completed and d/s 4th/9th completed.
The balance works shall be taken up sequentially after completion of necessary preparations, shuttering, and reinforcement checks.
In the mechanical work, sill beam in 4 span out of 10 span is completed.
After completion of Rt side Abutment, placing of cc block will be started on 27.01.2026
43/100
Instream Storage Structure, Gudvella
• 1. Reinforcement & shuttering work at right side u/s flank wall for 7th lift RCC is under progress.
2. Shuttering work at right side u/s flared out wall is under progress on 27.01.2026
44/100
Instream Storage Structure, Gudvella
Shuttering work at right side d/s flared out wall is under progress on 27.01.2026
45/100
Instream Storage Structure, Gudvella
• 1. Reinforcement work at right side D/s flank wall for 6th lift RCC is under progress.
2. Reinforcement work at right side D/s wing wall for 5th lift RCC is under progress on 27.01.2026
46/100
Instream Storage Structure, Gudvella
Reinforcement work at right side Abutment A2 for 8th lift RCC is under progress on 27.01.2026
47/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-5 of Pier no.5 for 7th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 74mm on 27.01.2026
48/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-5 of Pier no.5 for 7th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 74mm on 27.01.2026
49/100
Instream Storage Structure, Nandagaon
• 5. Fixing & fittings and alignment of 2nd. stage embedded parts and sufficient numbers of dowel bars at roller tracks of both stoplog & service gate grooves at bay No.5 of Pier No. 5 for 7th lift has been checked and found correct by HM Expert of PMC during his site visit on dt.21.01.2026 in presence of all civil n mechanical Site Engineers of PMC and EPC Agency as per the approved Mechanical drawing & designs. (i)Accordingly the rigid n smooth shuttering for placing the 2nd Stage concrete is completed as follows:
(ii) Chipping of old vertical concrete surface is done.
(iii).The area is cleaned properly through air water jetting and passed by SE, KID, Bhawanipatna for placing with RCC M35A20 grade on 27.01.2026
50/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.6 for 6th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 74mm on 27.01.2026
51/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.6 for 6th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 74mm on 27.01.2026
52/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.6 for 6th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 77mm on 27.01.2026
53/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.6 for 6th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 77mm on 27.01.2026
54/100
UGPL, Left Lower Suktel Canal Division
TEE connection work is in progress to HDPE pipeline at LO-292, LM-15 near village Sargad.
55/100
Instream Storage Structure, Nandagaon
• 4. The casting of CC blocks at following area havr been checked in presence of PM, EPC agency, Site Engineers of PMC & EPC Agency: (i) 2Nos. CC block at U/S right Flared out wall i.e 1no. of size 4.8x1.5x0.6m from sec.4-4 to sec.5-5 for 7th lift upto RL-240.0m and 1no. of size 6.0x1.5x0.6m from sec.2-2 to sec. 4-4 for 8th lift upto RL-240.60m is completed.
(ii) Filling of inverted filter materials covering with LDPE paper adjacent to each CC block in earth side are done before placement.
(iii) Application of 2 coat bitumen paint at cj's concrete surface is done.
(iv). Area is ready and passed by SE KID, Bh. Patna to place concrete with PCC M20A20 grade on 27.01.2026
56/100
Instream Storage Structure, Nandagaon
• 3. Fixing & fittings and alignment of 2nd. stage embedded parts and sufficient numbers of dowel bars at roller tracks of both stoplog & service gate grooves at bay No.6 of Pier No. 6 for 6th lift has been checked and found correct by HM Expert of PMC during his site visit on dt.21.01.2026 in presence of all civil n mechanical Site Engineers of PMC and EPC Agency as per the approved Mechanical drawing & designs.
(i)Accordingly the rigid n smooth shuttering for placing the 2nd. Stage concrete is completed as follows:
(ii) Chipping of old vertical concrete surface is done.
(iii).The area is cleaned properly through air water jetting and passed by SE, KID, Bhawanipatna for placing with RCC M35A20 grade on 27.01.2026
57/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M20A20 grade of 3nos. of C.C blocks at D/S left flared out wall i.e. 1no at sec.2-2 for 9th lift, 1no. from sec.4-4 to 5-5 for 10th lift & 1no. from sec.5-5 to sec.6-6 for 11th lift of 0.6m hight upto RL-241.20m is in progress in presence of PM, EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 73mm on 27.01.2026
58/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M20A20 grade of 3nos. of C.C blocks at D/S left flared out wall i.e. 1no at sec.2-2 for 9th lift, 1no. from sec.4-4 to 5-5 for 10th lift & 1no. from sec.5-5 to sec.6-6 for 11th lift of 0.6m hight upto RL-241.20m is in progress in presence of PM, EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 73mm on 27.01.2026
59/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.5 for 4th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 75mm on 27.01.2026
60/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.5 for 4th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 75mm on 27.01.2026
61/100
Instream Storage Structure, Nandagaon
• 2.The casting of CC blocks at following area has been checked in presence of PM,EPC agency, Site Engineers of PMC & EPC Agency:
(i) 3Nos. CC blocks at D/S left Flared out wall i.e 1no. of size 6.0x1.5x0.6m at sec.2-2 for 9th lift and 1no. of size 6.0x1.5x0.6m from sec. 4-4 to sec. 5-5 for 10th lift and 1no. of size 3.6x1.5x0.6m from sec.5-5 to sec.6-6 for 11th lift of 0.6m hight upto RL-241.20m is completed.
(ii). Filling of inverted filter materials covering with LDPE paper at adjacent to each CC block in earth side are done before placement.
(iii) Application of 2 coat bitumen paint at cj's concrete surface is done.
(iv). Area is ready and passed by SE KID, Bh. Patna to place concrete with PCC M20A20 grade on 27.01.2026
62/100
Instream Storage Structure, Nandagaon
• 1. Fixing & fittings and alignment of 2nd. stage embedded parts and sufficient numbers of dowel bars at roller tracks of both stoplog & service gate grooves at bay No.6 of Pier No. 5 for 4th lift has been checked and found correct by HM Expert of PMC during his site visit on dt.21.01.2026 in presence of all civil n mechanical Site Engineers of PMC and EPC Agency as per the approved Mechanical drawing & designs. (i)Accordingly the rigid n smooth shuttering for placing the 2nd. Stage concrete is completed as follows:
(ii) Chipping of old vertical concrete surface is done.
(iii).The area is cleaned properly through air water jetting and passed by SE, KID, Bhawanipatna for placing with RCC M35A20 grade on 27.01.2026
63/100
Instream Storage Structure, Nandagaon
All 12 nos of barrage bay gate lifting hook fit-up, guide shoe and welding under progress on 27.01.2026
64/100
UGPL, Left Lower Suktel Canal Division
Slump testing work is in progress for internal approach road block casting at Pump House in presence of DoWR JE, PMC team and MEIL staff.
65/100
Instream Storage Structure, Nandagaon
Under sluice barrage bay gate lifting hook fit-up and welding under progress on 27.01.2026
66/100
Instream Storage Structure, Nandagaon
Shuttering for CC blocks at U/S right flared out wall, Block-2 is in progress on 27.01.2026
67/100
Instream Storage Structure, Nandagaon
Reinforcement binding, shuttering & curing at right abutment, Block-2 is in progress on 27.01.2026
68/100
Instream Storage Structure, Nandagaon
Shuttering at D/S left flared out wall, Block-1 is in progress on 27.01.2026
69/100
Instream Storage Structure, Nandagaon
Reinforcement binding at D/S right flared out wall Cut-off, Block-2 is under progress on 27.01.2026
70/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M20A20 grade of 2nos. C.C blocks at U/S right flared out wall i.e. 1no. at sec.5-5 for 6th lift upto RL-239.40m & 1no. at sec.4-4 for 7th lift upto RL-240.0m is in progress in presence of PM, EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 72mm on 26.01.2026
71/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M20A20 grade of 2nos. C.C blocks at U/S right flared out wall i.e. 1no. at sec.5-5 for 6th lift upto RL-239.40m & 1no. at sec.4-4 for 7th lift upto RL-240.0m is in progress in presence of PM, EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 72mm on 26.01.2026
72/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.6 for 5th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency.The slump test value is 77mm on 26.01.2026
73/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.6 for 5th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency.The slump test value is 77mm on 26.01.2026
74/100
Instream Storage Structure, Nandagaon
• 2. Fixing & fittings and alignment of 2nd. stage embedded parts and sufficient numbers of dowel bars at roller tracks of both stoplog & service gate grooves at bay No.6 of Pier No. 6 for 5th lift has been checked and found correct by HM Expert of PMC during his site visit on dt.21.01.2026 in presence of all civil n mechanical Site Engineers of PMC and EPC Agency as per the approved Mechanical drawing & designs.
(i)Accordingly the rigid n smooth shuttering for placing the 2nd. Stage concrete is completed as follows:
(ii) Chipping of old vertical concrete surface is done.
(iii).The area is cleaned properly through air water jetting and passed by SE, KID, Bhawanipatna for placing with RCC M35A20 grade on 26.01.2026
75/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-5 of Pier no.4 for 7th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 78mm on 26.01.2026
76/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-5 of Pier no.4 for 7th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 78mm on 26.01.2026
77/100
Instream Storage Structure, Nandagaon
• 1. Fixing & fittings and alignment of 2nd. stage embedded parts and sufficient numbers of dowel bars at roller tracks of both stoplog & service gate grooves at bay No.5 of Pier No. 4 for 7th lift have been checked and found correct by HM Expert of PMC during his site visit on dt.21.01.2026 in presence of all civil n mechanical Site Engineers of PMC and EPC Agency as per the approved Mechanical drawing & designs.
(i)Accordingly the rigid n smooth shuttering for placing the 2nd. Stage concrete is completed as follows:
(ii) Chipping of old vertical concrete surface is completed.
(iii).The area is cleaned properly through air water jetting and passed by SE, KID, Bhawanipatna for placing concrete with RCC M35A20 grade on 26.01.2026
78/100
Instream Storage Structure, Nandagaon
Curing at U/S right flared out wall wall is in progress on 26.01.2026
79/100
Instream Storage Structure, Nandagaon
Curing at U/S right flank wall is in progress on 26.01.2026
80/100
Instream Storage Structure, Nandagaon
Shuttering at U/S right flared out wall is under progress on 26.01.2026
81/100
Instream Storage Structure, Gudvella
Cast of concrete at right side u/s flared out wall from sec 2a-2a to 4-4 is ready for 7th lift PCC M15A40 from RL 152.20m to 152.80m. is under progress through chute in the presence of Dept JE, site engineer of PMC and agency forman. The slump test value is 75mm on 26.01.2026
82/100
Instream Storage Structure, Gudvella
Cast of concrete at right side u/s flared out wall from sec 2a-2a to 4-4 is ready for 7th lift PCC M15A40 from RL 152.20m to 152.80m. is under progress through chute in the presence of Dept JE, site engineer of PMC and agency forman. The slump test value is 75mm on 26.01.2026
83/100
Instream Storage Structure, Gudvella
Casting of concrete at right side u/s flared out wall from sec 1-1 to 2-2 for 9th lift PCC M15A40 from RL 153.40m to 154.00munderprogress through chute in the presence of Dept JE, site engineers of PMC and agency forman. The slump test value is 68mm on 26.01.2026
84/100
Instream Storage Structure, Gudvella
Casting of concrete at right side u/s flared out wall from sec 1-1 to 2-2 for 9th lift PCC M15A40 from RL 153.40m to 154.00munderprogress through chute in the presence of Dept JE, site engineers of PMC and agency forman. The slump test value is 68mm on 26.01.2026
85/100
Instream Storage Structure, Gudvella
• 1. Reinforcement work at right side u/s flank wall for 7th lift RCC is under progress.
2. Shuttering work at right side u/s flared out wall is under progress on 26.01.2026
86/100
Instream Storage Structure, Gudvella
Reinforcement work at right side D/s flank wall for 6th lift RCC is under progress on 26.01.2026
87/100
Instream Storage Structure, Gudvella
• 1. Shuttering work at right side d/s wing wall for 5th lift RCC is under progress.
2. Reinforcement & shuttering work at right side d/s flank wall for 6th lift RCC is under progress.
3. Shuttering work at right side d/s flared out wall is under progress on 25.01.2026
88/100
Instream Storage Structure, Gudvella
Reinforcement work at right side Abutment A2 for 8th lift RCC is under progress on 25.01.2026
89/100
Instream Storage Structure, Gudvella
• 1. Reinforcement & shuttering work at right side u/s flank wall for 7th lift RCC is under progress.
2. Shuttering work at right side u/s flared out wall is under progress on 25.01.2026
90/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.5 for 3rd lift and Pier no.6 for 4th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 75mm on 25.01.2026
91/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at bay-6 of Pier no.5 for 3rd lift and Pier no.6 for 4th lift is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 75mm on 25.01.2026
92/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M20A20 grade of 2nos. of C.C blocks at U/S left flared out wall i.e. 1no. at sec.5-5 for 5th lift upto RL-238.80m & 1no. ar sec.4-4 for 6th lift upto RL-239.40m is in progress in presence of PM, EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 78mm on 25.01.2026
93/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M20A20 grade of 2nos. of C.C blocks at U/S left flared out wall i.e. 1no. at sec.5-5 for 5th lift upto RL-238.80m & 1no. ar sec.4-4 for 6th lift upto RL-239.40m is in progress in presence of PM, EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 78mm on 25.01.2026
94/100
Instream Storage Structure, Nandagaon
• 3.The casting of CC block at following area has been checked in presence of PM, EPC agency, Site Engineers of PMC & EPC Agency:
(i)2Nos. CC block at U/S right Flared out wall i.e 1no. of size 4.4x1.5x0.6m at sec. 5-5 for 5th lift upto RL-238.80m and 1no. of size 4.5x1.5x0.6m at sec. 4-4 for 6th lift upto RL-239.40m is completed.
(ii). Filling of inverted filter materials covering with LDPE paper adjacent to each CC block in earth side are done before placement.
(iii) Applied of 2 coat bitumen paint at cj's concrete surface.
(iv). Area is ready and passed by SE KID, Bh. Patna to place concrete with PCC M20A20 grade on 25.01.2026
95/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M20A20 grade of 4nos. of C.C blocks at D/S left flared out wall i.e. 1no from sec.1-1 to sec.2-2 for 6th lift, 1no. from sec.2-2 to 4-4 for 9th lift & 1no. from sec.4-4 to sec.5-5 for 10th lift and 1no. at sec. 6-6 of 0.6m hight from upto RL-241.20m is in progress in presence of PM, EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 74mm on 25.01.2026
96/100
Instream Storage Structure, Nandagaon
Concrete casting with PCC M20A20 grade of 4nos. of C.C blocks at D/S left flared out wall i.e. 1no from sec.1-1 to sec.2-2 for 6th lift, 1no. from sec.2-2 to 4-4 for 9th lift & 1no. from sec.4-4 to sec.5-5 for 10th lift and 1no. at sec. 6-6 of 0.6m hight from upto RL-241.20m is in progress in presence of PM, EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 74mm on 25.01.2026
97/100
Instream Storage Structure, Nandagaon
• 2. The casting of CC blocks at following area has been checked in presence of PM,EPC agency,Site Engineers of PMC & EPC Agency:
(i) 4Nos. CC block of size 6.0x1.5x0.6m at D/S left Flared out wall i.e 1no. from sec.1-1 to sec. 2-2 for 6th lift and 1no. from sec. 2-2 to sec. 4-4 for 9th lift and 1no. from sec. 4-4 to sec. 5-5 for 10th lift and 1no. of size 3.6x1.8x0.6m at sec. 6-6 of upto RL-241.20m is completed.
(ii). Filling of inverted filter materials covering with LDPE paper adjacent to each CC block in earth side are done before placement.
(iii) Applied of 2 coat bitumen paint at CJ's concrete surface.
(iv). Area is ready and passed by SE KID, Bh. Patna to place concrete with PCC M20A20 grade on 25.01.2026
98/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at Pier no.4 for 9th lift of bay no.4 & Pier no.5 for 6th lift of bay no.5 is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 76mm on 25.01.2026
99/100
Instream Storage Structure, Nandagaon
Concrete casting with M35A20 grade for 2nd stage concrete for stoplog & service gate grooves at Pier no.4 for 9th lift of bay no.4 & Pier no.5 for 6th lift of bay no.5 is in progress in presence of PM,EPC agency,Site Engineers of PMC & Site Engineer of EPC agency. The slump test value is 76mm on 25.01.2026
100/100
Instream Storage Structure, Nandagaon
• 1. Fixing & fittings and alignment of 2nd. stage embedded parts and sufficient numbers of dowel bars at roller tracks of both stoplog & service gate grooves at bay No.4 &5 of Pier No. 4 for 9th lift and pier no.5 for 6th lift have been checked and found correct by HM Expert of PMC during his site visit on dt.21.01.2026 in presence of all civil n mechanical Site Engineers of PMC and EPC Agency as per the approved Mechanical drawing & designs.
(i) Accordingly the rigid n smooth shuttering for placing the 2nd. Stage concrete is completed as follows:
(ii) Chipping of old vertical concrete surface is completed.
(iii).The area is cleaned properly through air water jetting and passed by SE, KID, Bhawanipatna for placing concrete with RCC M35A20 grade on 25.01.2026
❮
❯